Kondhane – CIDCO
KONDHANE - CIDCO IRRIGATION SCHEME |
CLIENT: City and Industrial Development Corporation (CIDCO) of Maharashtra Limited |
LOCATION: Maharashtra, India |
SCOPE OF SERVICES:
Scope of Work includes Preparation of Detailed Project Report (DPR) including outlet arrangement for irrigation and water supply / hydro Power with intake structure and captive hydro power plant. In Design Phase:- Project Engineering, Geology, Cost Estimation and Drawings volumes including salient features, survey and investigations, hydrology, design of civil structures, electro-mechanical and hydro-mechanical design, financial evaluation of the project acceptable to the relevant regulatory authorities. Preparation of R & R plan and obtaining statutory clearance from all the concerned departments for taking up the project. Preparation of bid document and its evaluation. Preparation of the Construction drawing for execution, scrutiny of variations, study of time cost overrun and periodic inspection of the execution of work. |
PROJECT DESCRIPTION:
Kondhane Dam Project is primarily a drinking water Project located near the village Kondhane in Maharashtra. Project was envisaged to meet the increasing demand of drinking water for the city of Navi Mumbai. City and Industrial Development Corporation of Maharashtra (CIDCO), a wholly owned company of govt. of Maharashtra, is the planning and the development authority of city of Navi Mumbai which is spread over an area of 344 sq. km. PROJECT CHARACTERISTICS:The project envisages construction of 74 m high Concrete Faced Rock Fill Dam (CFRD) and outlet arrangement for irrigation and water supply / hydro power with intake structure and captive hydro power plant. The capacity of the reservoir shall be 105.97 MCM out of which 10.55 MCM shall be released for irrigation purpose. |
Mahama & Mpanga Irrigation Scheme
MAHAMA & MPANGA IRRIGATION SCHEME |
CLIENT: WAPCOS Limited |
LOCATION: Eastern Province, Rwanda |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Preparation of Detailed Project Report (DPR), Tender Design, Technical Specifications and assistance to WAPCOS for the Intake System Works for Irrigation Schemes in Mpanga and Mahama Sectors of Easter Province of Rwanda. |
PROJECT DESCRIPTION:
The intake system of the Project involves construction of off-taking structures, head regulator, sedimentation tank, pump house, rising main and storage tank for irrigation from the River Akagera on the Rwanda – Tanzania border. The River has a minimum flow of 90 m3/s and a maximum discharge of 694 m3/s corresponding to return period flood of 1 in 40 years. The Project requires pumping of silt-free water to storage tank by construction of required number of off-tanking intake and its associated structures along the left bank of Kagera River covering Mpanga and Mahama Sectors. |