{"id":1332,"date":"2021-12-06T09:26:19","date_gmt":"2021-12-06T09:26:19","guid":{"rendered":"http:\/\/www.aquagreen.in\/?p=1332"},"modified":"2021-12-08T06:30:48","modified_gmt":"2021-12-08T06:30:48","slug":"karnah-jkspdcl","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2021\/12\/06\/karnah-jkspdcl\/","title":{"rendered":"Karnah &#8211; JKSPDCL"},"content":{"rendered":"<table width=\"664\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"664\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-1336 size-medium\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2021\/12\/Karna-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.aquagreen.in\/wp-content\/uploads\/2021\/12\/Karna-300x200.jpg 300w, https:\/\/www.aquagreen.in\/wp-content\/uploads\/2021\/12\/Karna.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/td>\n<\/tr>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>KARNAH HYDRO ELECTRIC PROJECT<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>CLIENT: <\/strong><\/p>\n<p>Jammu and Kashmir State Power Development Corporation Limited<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>LOCATION: <\/strong><\/p>\n<p>Kashmir, India<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>SCOPE OF SERVICES: <\/strong><\/p>\n<p style=\"text-align: justify;\">Review of contractor\u2019s design, Supervision of construction of Civil, Hydro Mechanical\/ Electromechanical works. Supervision of manufacture of equipment, Management of contractor\u2019s claims, Assurance of Quality control.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>PROJECT DESCRIPTION: <\/strong><\/p>\n<p style=\"text-align: justify;\">The J&amp;K State Power Development Corporation intends to implement 12 MW Karnah Hydro Electric Project under Prime Minister\u2019s Development Package -2015 (PMDP-2015) in Jammu and Kashmir State. The Karnah Hydroelectric Power Project (12 MW) with Installed capacity of 3&#215;4 MW is situated at the stream named Quazi Nag at the Basin of Kishan Ganga near village Khudri in Tehsil- Karnah, District-Kupwara, Jammu &amp; Kashmir corresponding to a design discharge of 13.47 cumecs and design head of 98.58 m.<\/p>\n<p><strong>PROJECT CHARACTERISTICS: <\/strong><\/p>\n<ul>\n<li style=\"text-align: justify;\">3 no. Horizontal Francis Turbine of each 4 MW capacity (3 x 4 MW)<\/li>\n<li style=\"text-align: justify;\">Open Trapezoidal Lined Canal Feeder Channel with design discharge of 13.47 cumecs and 100 m long; Trench weir of length 31.5 m<\/li>\n<li style=\"text-align: justify;\">Number of Intake gate (Vertical lift gate) are 2 of size (2.5 m x 2.6 m)<\/li>\n<li style=\"text-align: justify;\">\u00a0De-silting Chamber of length (36 m x24 m)<\/li>\n<li style=\"text-align: justify;\">Free Flowing Pipe Type Water Conductor System of 235.75 m<\/li>\n<li style=\"text-align: justify;\">Fore bay, Intake pool; 3 Nos. of Penstock 175 m long<\/li>\n<li style=\"text-align: justify;\">Powerhouse of size (47.5 m x 18.4 m x 20.75 m)<\/li>\n<li style=\"text-align: justify;\">Tail Race Tunnel of length 86.55m with minimum tail water level of 1413.26<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/Karnah_JKSPDCL.pdf\" target=\"_blank\" rel=\"attachment noopener wp-att-300 noreferrer\"><b><u><b><span style=\"color: #0099cc;\">More Details<\/span><\/b><\/u><\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>KARNAH HYDRO ELECTRIC PROJECT CLIENT: Jammu and Kashmir State Power Development Corporation Limited LOCATION: Kashmir, India SCOPE OF SERVICES: Review of contractor\u2019s design, Supervision of construction of Civil, Hydro Mechanical\/ Electromechanical works. Supervision of manufacture of equipment, Management of contractor\u2019s<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1332"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=1332"}],"version-history":[{"count":8,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1332\/revisions"}],"predecessor-version":[{"id":1363,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1332\/revisions\/1363"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=1332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=1332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=1332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}