{"id":1849,"date":"2026-07-02T10:32:09","date_gmt":"2026-07-02T10:32:09","guid":{"rendered":"http:\/\/www.aquagreen.in\/?p=1849"},"modified":"2026-07-02T10:34:26","modified_gmt":"2026-07-02T10:34:26","slug":"vijayanagar-psp","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2026\/07\/02\/vijayanagar-psp\/","title":{"rendered":"Vijayanagar PSP"},"content":{"rendered":"<table width=\"664\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"664\">&nbsp;<img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-736\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2026\/07\/VijayanagarPSP.jpg\" alt=\"MANGDAM\" width=\"150\" height=\"100\"><\/td>\n<\/tr>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>Consultancy services for preparation of Detailed Project Report for 130 MW Vijayanagar pumped storage project in Vijayanagar, Karnataka, India<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>CLIENT: <\/strong><br \/>\nJSW Hydro Energy Limited<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>Year: <\/strong><br \/>\n2021 \u2013 2023<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>Scope: <\/strong><\/p>\n<ul style=\"margin-left: 20px;\">\n<li style=\"list-style-type: none;\">\n<ul style=\"margin-left: 20px;\">\n<li style=\"text-align: justify;\">To prepare the scope of works for topographical survey, geotechnical investigations, and laboratory tests as per CEA guidelines; and help the Owner in finalization of agencies for the above works. In addition, the consultant shall check the deliverables for their use in preparation of DPR.<\/li>\n<li style=\"text-align: justify;\">Assessment of Project\u2019s Hydrology &amp; power potential studies<\/li>\n<li style=\"text-align: justify;\">Assessment of Site Geology and Geological Mapping, &amp; Preparation of Geological Maps required for completion of Geological chapter.<\/li>\n<li style=\"text-align: justify;\">Monitoring of surface and sub-surface explorations, Interpretation and Incorporation of data for studies of optimization of layout.<\/li>\n<li style=\"text-align: justify;\">DPR level Design of Civil Structures for various components of the Project.<\/li>\n<li style=\"text-align: justify;\">DPR level Design of Electro-mechanical works.<\/li>\n<li style=\"text-align: justify;\">Review of Site-Specific Seismic Parameter Study Report for the project including recommendations for the design.<\/li>\n<li style=\"text-align: justify;\">Review of details of construction materials availability, Engineering Properties and its test results and finalization of the same.<\/li>\n<li style=\"text-align: justify;\">Preparation of Construction Program and Plant Planning.<\/li>\n<li style=\"text-align: justify;\">Preparation of Construction Methodology.<\/li>\n<li style=\"text-align: justify;\">Preparation of Project Organization and Infrastructure facilities.<\/li>\n<li style=\"text-align: justify;\">Preparation of Detailed Cost Estimates for the project components of Civil, Hydro-Mechanical and Electro-Mechanical Works including Transmission line.<\/li>\n<li style=\"text-align: justify;\">Financial and Economic analysis of the project as per CERC guidelines.<\/li>\n<li style=\"text-align: justify;\">Preparation and Submission of Feasibility Report (FR) for Phase \u2013 1, if required by CEA prior to submission of DPR.<\/li>\n<li style=\"text-align: justify;\">Preparation of Detailed Project Report as per CEA\/CWC\/GSI\/CSMRS guidelines.<\/li>\n<li style=\"text-align: justify;\">Technical Assistance and presentations to Owner\/CEA\/CWC\/Lenders\/Lender\u2019s Engineers till approval\/ concurrence from the CEA\/Statutory approvals.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; Consultancy services for preparation of Detailed Project Report for 130 MW Vijayanagar pumped storage project in Vijayanagar, Karnataka, India CLIENT: JSW Hydro Energy Limited Year: 2021 \u2013 2023 Scope: To prepare the scope of works for topographical survey, geotechnical<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[14],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1849"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=1849"}],"version-history":[{"count":3,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1849\/revisions"}],"predecessor-version":[{"id":1853,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1849\/revisions\/1853"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=1849"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=1849"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=1849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}