{"id":1859,"date":"2026-07-02T11:21:13","date_gmt":"2026-07-02T11:21:13","guid":{"rendered":"https:\/\/www.aquagreen.in\/?p=1859"},"modified":"2026-07-02T11:36:52","modified_gmt":"2026-07-02T11:36:52","slug":"shahpur-psp","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2026\/07\/02\/shahpur-psp\/","title":{"rendered":"Shahpur PSP"},"content":{"rendered":"<table width=\"664\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"664\">\u00a0<img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-736\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2026\/07\/ShahpurPSP.jpg\" alt=\"MANGDAM\" width=\"150\" height=\"100\" \/><\/td>\n<\/tr>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>Design Review Engineering of Shahpur Pumped Storage Project (5 x 300 MW + 2 x 150 MW), Baran District, Rajasthan<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>CLIENT: <\/strong><br \/>\nGreenko RJ01 IREP Private Limited<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>Year: <\/strong><br \/>\n2024 \u2013 Ongoing<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>Project Features: <\/strong><\/p>\n<p style=\"text-align: justify;\">This is Standalone Pumped Storage Project having 10800 MW Storage Capacity and 1800 MW rating. The peak operation duration shall be 6.15 hrs.<\/p>\n<p style=\"text-align: justify;\">The major project components are:<\/p>\n<ul style=\"margin-left: 20px;\">\n<li style=\"list-style-type: none;\">\n<ul style=\"margin-left: 20px;\">\n<li style=\"text-align: justify;\">Upper Reservoir: 1.01 TMC Live Storage, 0.20 TMC Dead Storage, 1.21 TMC Gross Storage. FRL is at EL 507 m, MDDL is at EL 490 m Asphalt Faced Rockfill Embankment having height of 31 m and length of 5451 m<\/li>\n<li style=\"text-align: justify;\">Lower Reservoir: 1.01 TMC Live Storage, 0.05 TMC Dead Storage, 1.06 TMC Gross Storage, FRL is at EL 349 m, MDDL is at 328 m. Asphalt Faced Rockfill Embankment having height of 38 m and length of 2937 m<\/li>\n<li style=\"text-align: justify;\">Head Race Pipe \/ Pressure Shafts: Finished Circular Steel Lined, Total 6 no. of Independent Head Race Pipe \/ Pressure Shaft with one Pressure Tunnel bifurcating into two-unit pressure tunnel, diameter of Horizontal Pressure Tunnel is 7.5 m and the diameter of unit Pressure Tunnel is 5.3 m. Total length of Tunnel is 944 m.<\/li>\n<li style=\"text-align: justify;\">Powerhouse: Surface Pit Type Powerhouse having dimensions, 196.166 m (L) x 28.5 m (W) x 62.2 m (H)<\/li>\n<li style=\"text-align: justify;\">Tail Race Tunnel: 7 nos. Concrete Circular Lined having 8.5 m diameter for 300 MW unit and 6.20 m diameter for 150 MW unit<\/li>\n<li style=\"text-align: justify;\">Electro-Mechanical Equipment: 5 nos. (300 MW) and 2 nos. (150 MW) Francis Type, Vertical Shaft Reversible Pump-turbines 154.73 m and 162.56 m are the rated head in Turbine and Pumping Mode for 300 MW unit respectively and 154.41 m and 163.21 for 150 MW unit.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>Scope: <\/strong><\/p>\n<p style=\"text-align: justify;\">Design Review Engineering of:<\/p>\n<ul style=\"margin-left: 20px;\">\n<li style=\"list-style-type: none;\">\n<ul style=\"margin-left: 20px;\">\n<li style=\"text-align: justify;\">Civil Works<\/li>\n<li style=\"text-align: justify;\">Hydro-Mechanical Works<\/li>\n<li style=\"text-align: justify;\">Electro-Mechanical Works<\/li>\n<li style=\"text-align: justify;\">Periodic Project Construction Supervision<\/li>\n<li style=\"text-align: justify;\">Periodic Inpections<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Design Review Engineering of Shahpur Pumped Storage Project (5 x 300 MW + 2 x 150 MW), Baran District, Rajasthan CLIENT: Greenko RJ01 IREP Private Limited Year: 2024 \u2013 Ongoing Project Features: This is Standalone Pumped Storage Project having<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[14],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1859"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=1859"}],"version-history":[{"count":4,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1859\/revisions"}],"predecessor-version":[{"id":1865,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/1859\/revisions\/1865"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=1859"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=1859"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=1859"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}