{"id":249,"date":"2015-08-05T09:26:40","date_gmt":"2015-08-05T09:26:40","guid":{"rendered":"http:\/\/www.aquagreen.in\/?p=249"},"modified":"2016-04-22T07:30:40","modified_gmt":"2016-04-22T07:30:40","slug":"demwe-lower-hydroelectric-project","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2015\/08\/05\/demwe-lower-hydroelectric-project\/","title":{"rendered":"Emra HEP"},"content":{"rendered":"<table width=\"664\">\n<tbody>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-740\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/EmraII-300x200.jpg\" alt=\"EmraII\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/EmraII-300x200.jpg 300w, https:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/EmraII.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>EMRA \u2013 II HYDROELECTRIC PROJECT<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>CLIENT: <\/strong><\/p>\n<p>Athena Emra Power Private Limited<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>LOCATION: <\/strong><\/p>\n<p>Arunachal Pradesh, India<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>SCOPE OF SERVICES: <\/strong><\/p>\n<p style=\"text-align: justify;\">AEMPL provided engineering consultancy services for optimum utilization of Emra River and preparation of pre-feasibility report for Emra \u2013 II (315MW) HE Project and obtaining approval from statuary authorities.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>PROJECT DESCRIPTION: <\/strong><\/p>\n<p style=\"text-align: justify;\">The Project is a run of river\/storage type Hydroelectric Project on confluence of Emra &amp; Tangon river in Dibang River, Arunachal Pradesh. AEMPL was involved in preparation of various alternatives at Pre-feasibility stage and from which one alternative is considered which is cost-effective and techno-economically layout.<\/p>\n<p style=\"text-align: justify;\">The project consists of gravity dam of height 113 m and of length 256 m across River Subansiri where the river bed elevation is EL. 594 m. The water for power generation is conveyed through a steel pressure shaft of 7 m diameter which further bifurcates to feed the units in the underground power house. The underground power house is situated in the left bank of River Emra and measures79 m (l) x 14 m (w) x 15.5 m (h). The underground power houses 3 vertical axis Francis turbines to generate 315 MW. The design energy in the calculated to be 1491.59 MU.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/EmraII_HEP.pdf\" target=\"_blank\" rel=\"attachment wp-att-300\"><b><u><b><span style=\"color: #0099cc;\">More Details<\/span><\/b><\/u><\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>EMRA \u2013 II HYDROELECTRIC PROJECT CLIENT: Athena Emra Power Private Limited LOCATION: Arunachal Pradesh, India SCOPE OF SERVICES: AEMPL provided engineering consultancy services for optimum utilization of Emra River and preparation of pre-feasibility report for Emra \u2013 II (315MW) HE<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/249"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=249"}],"version-history":[{"count":18,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/249\/revisions"}],"predecessor-version":[{"id":364,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/249\/revisions\/364"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}