{"id":483,"date":"2015-09-02T09:50:52","date_gmt":"2015-09-02T09:50:52","guid":{"rendered":"http:\/\/www.aquagreen.in\/?p=483"},"modified":"2023-04-05T12:46:29","modified_gmt":"2023-04-05T12:46:29","slug":"yamne-ii-hydro-electric-project","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2015\/09\/02\/yamne-ii-hydro-electric-project\/","title":{"rendered":"Yamne &#8211; II HEP"},"content":{"rendered":"<table width=\"664\">\n<tbody>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>&nbsp;<img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-753\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/YamneII-300x200.jpg\" alt=\"YamneII\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/YamneII-300x200.jpg 300w, https:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/YamneII.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>YAMNE \u2013 II HYDROELECTRIC PROJECT<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>CLIENT: <\/strong><\/p>\n<p>S S Yamne Power Pvt. Ltd.<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>LOCATION: <\/strong><\/p>\n<p>Arunachal Pradesh, India<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>SCOPE OF SERVICES: <\/strong><\/p>\n<p style=\"text-align: justify;\">AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Concept to Commissioning Consulting Services of 90MW Yamne \u2013 II HE Project, Arunachal Pradesh.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>PROJECT DESCRIPTION: <\/strong><\/p>\n<p style=\"text-align: justify;\">Yamne Stage \u2013 II H.E. Project is located in the Upper Siang District of Arunachal Pradesh on Yamne river. The average river bed level at the barrage site is about EL. 517 m and FRL at the barrage has been proposed at EL. 536.0 m. The Project will utilize a gross head of 96.0 m and design discharge of 117.32 Cumecs for generation of 90 MW.<\/p>\n<p style=\"text-align: justify;\">Yamne \u2013 II H.E Project envisages of 22 m high Barrage with diversion tunnel &amp; channel as diversion structure, 20m wide approach channel, 2Nos of De-silting Basin, 1No.of Power Intake with trash rack arrangement, 1No. of 6.5 m diameter head race tunnel&amp;6.34 km long, 1No.of 19.0 m diameter surge shaft&amp;93.80 m high, 1No.of 5.5 m diameter pressure tunnels &amp; 187.21 m long . A Surface power station housing 3 units of 30 MW each. Design Energy is 367.43 MU in 90% dependable year.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/YamneII_HEP.pdf\" target=\"_blank\" rel=\"attachment wp-att-300 noopener noreferrer\"><b><u><b><span style=\"color: #0099cc;\">More Details<\/span><\/b><\/u><\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; YAMNE \u2013 II HYDROELECTRIC PROJECT CLIENT: S S Yamne Power Pvt. Ltd. LOCATION: Arunachal Pradesh, India SCOPE OF SERVICES: AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Concept to Commissioning<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/483"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=483"}],"version-history":[{"count":6,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/483\/revisions"}],"predecessor-version":[{"id":1516,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/483\/revisions\/1516"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=483"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=483"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}