{"id":800,"date":"2016-04-22T09:47:57","date_gmt":"2016-04-22T09:47:57","guid":{"rendered":"http:\/\/www.aquagreen.in\/?p=800"},"modified":"2023-04-05T12:45:08","modified_gmt":"2023-04-05T12:45:08","slug":"dengser-hep","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2016\/04\/22\/dengser-hep\/","title":{"rendered":"Dengser HEP"},"content":{"rendered":"<table width=\"664\">\n<tbody>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-739\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/Dengser-300x200.jpg\" alt=\"Dengser\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/Dengser-300x200.jpg 300w, https:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/Dengser.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong>DENGSER HYDROELECTRIC PROJECT<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>CLIENT: <\/strong><\/p>\n<p>Arista Power Pvt. Ltd.<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>LOCATION: <\/strong><\/p>\n<p>Arunachal Pradesh, India<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>SCOPE OF SERVICES: <\/strong><\/p>\n<p style=\"text-align: justify;\">AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 520 MW Dengser Hydro Electric Project, Arunachal Pradesh and obtaining approval from statutory authorities.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"664\"><strong>PROJECT DESCRIPTION: <\/strong><\/p>\n<p style=\"text-align: justify;\">Dengser Hydro Electric Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about EL. 531 m and FRL at the dam has been proposed at EL. 620 m. The Project will utilize a gross head of 126.63 m and design discharge of 470.90 cumecs for generation of 520 MW.<\/p>\n<p style=\"text-align: justify;\">Dengser H.E Project envisages of 121.19 m high concrete gravity dam with 2 Nos. of 11 m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2 Nos. of 5.11 km &amp; 4.96 km long 9.20 m diameter head race tunnel, 2 Nos. of 25.0 m diameter surge shaft &amp; 50 m high &amp; 2 Nos. of 8.10 m diameter steel lined pressure shaft each of 324 m &amp; 264 m in length which include penstock of dia. 4.57 m on bifurcation. Underground power house housing4 units of 130 MW each. Design Energy is 1986.92 MU in 90% dependable year.<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2016\/04\/Dengser_HEP.pdf\" target=\"_blank\" rel=\"attachment wp-att-300 noopener noreferrer\"><b><u><b><span style=\"color: #0099cc;\">More Details<\/span><\/b><\/u><\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DENGSER HYDROELECTRIC PROJECT CLIENT: Arista Power Pvt. Ltd. LOCATION: Arunachal Pradesh, India SCOPE OF SERVICES: AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 520 MW Dengser Hydro Electric Project, Arunachal Pradesh and obtaining approval<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/800"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=800"}],"version-history":[{"count":3,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/800\/revisions"}],"predecessor-version":[{"id":1512,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/800\/revisions\/1512"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}