{"id":891,"date":"2017-03-31T13:03:52","date_gmt":"2017-03-31T13:03:52","guid":{"rendered":"http:\/\/www.aquagreen.in\/?p=891"},"modified":"2017-05-09T11:59:05","modified_gmt":"2017-05-09T11:59:05","slug":"road-project-west-bengal","status":"publish","type":"post","link":"https:\/\/www.aquagreen.in\/index.php\/2017\/03\/31\/road-project-west-bengal\/","title":{"rendered":"Road Project \u2013 West Bengal"},"content":{"rendered":"<table width=\"658\">\n<tbody>\n<tr>\n<td width=\"664\">\n<p style=\"text-align: center;\"><strong><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-880\" src=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2017\/03\/West-Bengal1-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.aquagreen.in\/wp-content\/uploads\/2017\/03\/West-Bengal1-300x195.jpg 300w, https:\/\/www.aquagreen.in\/wp-content\/uploads\/2017\/03\/West-Bengal1.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"658\"><strong>FOUR LANING ROAD PROJECT<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"658\"><strong>CLIENT: <\/strong><\/p>\n<p>HCC Concessions Ltd.<\/p>\n<p>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td width=\"658\"><strong>LOCATION:<\/strong><strong style=\"font-family: inherit; font-size: inherit;\">\u00a0<\/strong><\/p>\n<p>West Bengal, India<\/td>\n<\/tr>\n<tr>\n<td width=\"658\"><strong>SCOPE OF SERVICES: <\/strong><\/p>\n<p>AEMPL engaged to provide Consultancy Services for Contract Management and Dispute Resolution for the following Sections of NH-34 in West Bengal, India:<\/p>\n<ol>\n<li>Four Laning Road Project from Baharampore (191.416 Km) To Farakka (294.684 Km) Section of NH-34<\/li>\n<li>Four Laning Road Project From Farakka (295.00 Km) To Raiganj (398.00 Km) Section of NH-34<\/li>\n<li>Four Laning Road Project From Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34<\/li>\n<\/ol>\n<p>In addition, AEMPL engaged to provide Engineering Consultancy Services for Review of Rate Analysis for Four Laning Road Project From Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34in West Bengal, India<\/td>\n<\/tr>\n<tr>\n<td width=\"658\"><strong>PROJECT DESCRIPTION: <\/strong><\/p>\n<p>The Project is part of 3 contiguous road projects being executed by the HCC Group from Baharampore to Dalkhola (258.35 Km) along the NH34 in the state of West Bengal.<\/p>\n<ul>\n<li>Baharampore (191.416 Km) To Farakka (294.684 Km) Section of NH-34 \u2013 Length of Four Lane \u2013 100.6 Km<\/li>\n<li>Farakka (295.00 Km) To Raiganj (398.00 Km) Section of NH-34 \u2013 Length of Four Lane \u2013 103.00 Km<\/li>\n<li>Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34 \u2013 Length of Four Lane \u2013 54.75 Km<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: center;\"><a href=\"http:\/\/www.aquagreen.in\/wp-content\/uploads\/2017\/03\/Four-Laning-Road-Project-West-Bengal.pdf\" target=\"_blank\" rel=\"attachment wp-att-300\"><b><u><b><span style=\"color: #0099cc;\">More Details<\/span><\/b><\/u><\/b><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>FOUR LANING ROAD PROJECT CLIENT: HCC Concessions Ltd. &nbsp; LOCATION:\u00a0 West Bengal, India SCOPE OF SERVICES: AEMPL engaged to provide Consultancy Services for Contract Management and Dispute Resolution for the following Sections of NH-34 in West Bengal, India: Four Laning<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[9],"tags":[],"_links":{"self":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/891"}],"collection":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/comments?post=891"}],"version-history":[{"count":4,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/891\/revisions"}],"predecessor-version":[{"id":907,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/posts\/891\/revisions\/907"}],"wp:attachment":[{"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/media?parent=891"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/categories?post=891"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aquagreen.in\/index.php\/wp-json\/wp\/v2\/tags?post=891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}