![]() |
|
Ukai Pumped Storage Project (2400 MW), Gujarat, India |
| CLIENT: Greenko Energy Projects Private Limited |
| Year: 2022 |
| Features:
Upper Reservoir: (Live Storage: 1.39 TMC; Gross Storage: 2.23 TMC) Upper Dam: (Type: Rockfill Embankment with Central Clay Core; Height: 70 m; Length: 11468 m) Lower Reservoir: (Live Storage: 1.38 TMC; Gross Storage: 2.13 TMC) Lower Dam: (Type: Rockfill Embankment with Central Clay Core; Height: 45 m; Length: 1453 m) Powerhouse: (Type: Surface; Dimensions: 220 m x 24 m x 51.1 m) Penstock / Pressure Shafts: (Type: Finished Steel lined (circular); Number of Pressure Shaft: 8 no. Of Independent Penstocks; Diameter of Penstock: 7 m; Length of Penstock: 1105 m) Tail Race Tunnel: (Type: Concrete lined Circular); No. Of Tunnel: 8; Dia. Of tunnel: 8 m; Length of Tunnel: 25 m) Electro-Mechanical Equipment: (Pump Turbine: Francis type, vertical shaft reversible pump turbine; Total no. Of units: 8 no. (8 x 300 MW)) Two 400 kV Double Circuit Transmission Lines of length 109 km (approx.) from PSP will be connected to 400 kV/765 kV GIS, Kumetha -1 PGCIL Substation Gujarat State (Village Crossing) The major project components are:
|
| Scope:
Design Review Engineering of:
|

