Shendra – DMICCL

Shendra Delhi Mumbai Industrial Corridor Corporation Limited

CLIENT:

CH2M Hill International Private Limited (India)

ULTIMATE CLIENT:

Delhi Mumbai Industrial Corridor Development Corporation Limited

LOCATION:

Maharashtra, India

SCOPE OF SERVICES:

Construction Supervision of civil and electrical works; Contract Management including all aspects related to techical and commercial aspects. Project Planning, Monitoring, Control and Scheduling.
Study of the requirements and specifications of electrical and civil works given in the contract documents and corrigendum. Advice the client on adoption of technical specifications different for those contained principal contract and having adverse impact on the quantity and quality of works. Review of material test reports. Maintain the Quality Assurance and Quantity Control plan for the project.

PROJECT DESCRIPTION:

Shendra Bidkin Industrial Area (SBIA) is located at a distance of approximately 15 km from downtown Aurangabad and is 8 km east of the Aurangabad Airport. It is planned as a new industrial corridor extending from the existing Maharashtra Industrial Development Corporation’s (MIDC) Shendra Industrial Park to the town of Bidkin. The total area of SBIA admeasuring 84.17 sq. km has been divided into two parts viz. Part-I and Part-II. The Part-I consisting of area of 41.42 sq. km, which is further divided into two parts, viz. Phase-I and Phase-II. The Phase-I covers an area of 8.39 sq. km located north of Jalna Road adjoining existing MIDC Shendra Industrial Park. Phase-II includes the remaining area of 32.03 sq. km located near Bidkin. The development of the Part-II of SBIA consisting of total area of 42.75 sq. km will be taken up at the later stage.

PROJECT CHARACTERISTICS:

Sl. No. Power network elements Quantity
1 No. of substations 5
2 Power duct 91.3 km
3 33kV Panels 5 Sets
4 11kV Panels 5 Sets
5 Transformers (Main) 15 Nos.
6 Transformers (Auxiliary) 15 Nos.
7 LV Panels 10 Nos.
8 Ring Main Units 109 Nos.
9 33kV Cables 320.57 km
10 11kV Cables 52.98 km
11 Streetlights 2525 Nos.
12 High Mast Street Lights 12 Nos.

More Details

Bidkin – DMICCL

BDKIN Delhi Mumbai Industrial Corridor Corporation Limited
CLIENT:

CH2M Hill International Private Limited (India)

ULTIMATE CLIENT:

Delhi Mumbai Industrial Corridor Development Corporation Limited

LOCATION: 

Maharashtra, India

SCOPE OF SERVICES:

Construction Supervision of civil and electrical works; Contract Management including all aspects related to technical and commercial aspects. Project Planning, Monitoring, Control and Scheduling.
Study of the requirements and specifications of electrical and civil works given in the contract documents and corrigendum. Advice the client on adoption of technical specifications different for those contained principal contract and having adverse impact on the quantity and quality of works. Review of material test reports. Maintain the Quality Assurance and Quantity Control plan for the project.

PROJECT DESCRIPTION:

Shendra Bidkin Industrial Area (SBIA) is located at a distance of approximately 15 km from downtown Aurangabad and is 8 km east of the Aurangabad Airport. It is planned as a new industrial corridor extending from the existing Maharashtra Industrial Development Corporation’s (MIDC) Shendra Industrial Park to the town of Bidkin. The total area of SBIA admeasuring 84.17 sq. km has been divided into two parts viz. Part-I and Part-II. The Part-I consisting of area of 41.42 sq. km, which is further divided into two parts, viz. Phase-I and Phase-II. The Phase-I covers an area of 8.39 sq. km located north of Jalna Road adjoining existing MIDC Shendra Industrial Park. Phase-II includes the remaining area of 32.03 sq. km located near Bidkin. The development of the Part-II of SBIA consisting of total area of 42.75 sq. km will be taken up at the later stage.

Project Characteristics:

S. No. Power network elements Quantity
1 No. of substations 8 Nos.
2 Power duct 78 km
3 33kV Panels 66 Nos.
4 11kV Panels 210 Nos.
5 Transformers (Main) 30 Nos.
6 Transformers (Auxiliary) 16 Nos.
7 LV Panels 16 Nos.
8 Ring Main Units 322 Nos.
9 33kV Cables 133 km
10 11kV Cables 283 km
11 Streetlights 2100 Nos.
12 High Mast Street Lights 72 Nos.

More Details

Karnah – JKSPDCL

KARNAH HYDRO ELECTRIC PROJECT

CLIENT:

Jammu and Kashmir State Power Development Corporation Limited

LOCATION:

Kashmir, India

SCOPE OF SERVICES:

Review of contractor’s design, Supervision of construction of Civil, Hydro Mechanical/ Electromechanical works. Supervision of manufacture of equipment, Management of contractor’s claims, Assurance of Quality control.

PROJECT DESCRIPTION:

The J&K State Power Development Corporation intends to implement 12 MW Karnah Hydro Electric Project under Prime Minister’s Development Package -2015 (PMDP-2015) in Jammu and Kashmir State. The Karnah Hydroelectric Power Project (12 MW) with Installed capacity of 3×4 MW is situated at the stream named Quazi Nag at the Basin of Kishan Ganga near village Khudri in Tehsil- Karnah, District-Kupwara, Jammu & Kashmir corresponding to a design discharge of 13.47 cumecs and design head of 98.58 m.

PROJECT CHARACTERISTICS:

  • 3 no. Horizontal Francis Turbine of each 4 MW capacity (3 x 4 MW)
  • Open Trapezoidal Lined Canal Feeder Channel with design discharge of 13.47 cumecs and 100 m long; Trench weir of length 31.5 m
  • Number of Intake gate (Vertical lift gate) are 2 of size (2.5 m x 2.6 m)
  •  De-silting Chamber of length (36 m x24 m)
  • Free Flowing Pipe Type Water Conductor System of 235.75 m
  • Fore bay, Intake pool; 3 Nos. of Penstock 175 m long
  • Powerhouse of size (47.5 m x 18.4 m x 20.75 m)
  • Tail Race Tunnel of length 86.55m with minimum tail water level of 1413.26

More Details

Kondhane – CIDCO

Kondhane – CIDCO

KONDHANE – CIDCO IRRIGATION SCHEME

CLIENT:

City and Industrial Development Corporation
(CIDCO) of Maharashtra Limited

LOCATION:

Maharashtra, India

SCOPE OF SERVICES:

Scope of Work includes Preparation of Detailed Project Report (DPR) including outlet arrangement for irrigation and water supply / hydro Power with intake structure and captive hydro power plant. In Design Phase:- Project Engineering, Geology, Cost Estimation and Drawings volumes including salient features, survey and investigations, hydrology, design of civil structures, electro-mechanical and hydro-mechanical design, financial evaluation of the project acceptable to the relevant regulatory authorities. Preparation of R & R plan and obtaining statutory clearance from all the concerned departments for taking up the project. Preparation of bid document and its evaluation. Preparation of the Construction drawing for execution, scrutiny of variations, study of time cost overrun and periodic inspection of the execution of work.

PROJECT DESCRIPTION:

Kondhane Dam Project is primarily a drinking water Project located near the village Kondhane in Maharashtra. Project was envisaged to meet the increasing demand of drinking water for the city of Navi Mumbai. City and Industrial Development Corporation of Maharashtra (CIDCO), a wholly owned company of govt. of Maharashtra, is the planning and the development authority of city of Navi Mumbai which is spread over an area of 344 sq. km.

PROJECT CHARACTERISTICS:

The project envisages construction of 74 m high Concrete Faced Rock Fill Dam (CFRD) and outlet arrangement for irrigation and water supply / hydro power with intake structure and captive hydro power plant. The capacity of the reservoir shall be 105.97 MCM out of which 10.55 MCM shall be released for irrigation purpose.

More Details

LPG & POL Cross country Pipeline

 

LPG & POL Cross country Pipeline at VIZAG Terminal

PROJECT OWNER:

EAST INDIA PETROLEUM LIMITED

LOCATION:

Visakhapatnam, Andhra Pradesh

SCOPE OF SERVICES:

Jetty Area Scope of Work:

  • Collecting/ Review of Document Pertaining to the site conditions, geological data, LPG transfer system, LPG Blending system, heat exchanger design, on line blending and other design documents of utility services
  • Prepare and Finalization of layouts for the utility services required for online blending systems, jetty operations and Topsides facilities of the jetty.
  • Review the basic need of the heat exchanger by considering the process requirements and safety of the pipeline and finalize the concept design of the heat exchanger
  • Review and re-design of firefighting facilities for the utility services at Jetty per the regulations of OISD/NFPA or equivalent
  • Review and incorporating all the recommendations of HAZOP and Risk Analysis, EIA Study,

The LPG cross-country pipeline process design.

  • Collecting/reviewing the documents pertaining to the site humidity conditions, LPG unloading temperatures, LPG transfer system and other data pertaining to LPG heating system, heat exchanger design documents, on line blending design documents, and collecting all the engineering documents.
  • Checking/reviewing of preliminary Basic Engineering Document for landside pipelines up to LPG Terminal
  • Calculation of the total flow conditions and flow rate at the terminal end
  • Conducting the process simulation for the various scenarios. Conducting the surge analysis for the LPG pipeline for the two phases and recommending the proper common surge arresters
  • Checking/Conducting the thermal stress calculation/simulation for underground LPG pipe line

Piping & instrumentation drawing (P&ID) and equipment Layouts

  • Review and modification of P&I Drawings
  • Review the specifications of the all valves, instruments, Pipeline, equipment and make recommendations
  • Review and preparation of the all the equipment layouts, piping layouts, pipeline isometric drawings

 Design of the civil and electrical works

  • Design the entire SLD of the electrical system along with requirement of emergency power.
  • Prepare the detailed engineering documents, drawings and electrical equipment specifications
  • Prepare the detailed engineering documents, drawings specifications of the civil structures for equipment foundations, building structures and control room interiors.
PROJECT DESCRIPTION:

The project involves setting up off offloading facilities of LPG from transportation vessels at the Jetty area and subsequently transferred to storage facility, through the network piping of length 8.4KM.

More Details

CSR Policy

CSR Policy

Extract of Annual Return/18

EXTRACT OF ANNUAL RETURN/18

Nimu Chilling HEP

 

 NIMU

NIMU CHILLING HYDROELECTRIC PROJECT

CLIENT:
Jammu & Kashmir State Power Development Corporation Limited
LOCATION:
Leh, Jammu & Kashmir
SCOPE OF SERVICES:

    AEMPL has been engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report for Nimu Chilling HEP, Leh as per the guidelines of Alternate Hydro Energy Centre, Ministry of New and Renewable Energy, Government of India
PROJECT DESCRIPTION:

Nimu Chilling Hydro Electric Project has been contemplated as a run of the river scheme situated in the Leh district of Jammu & Kashmir. The barrage site is located on River Zanskar just before its confluence with the mighty Indus River. The Project will utilize a gross head of 45 m and design discharge of about 59 cumecs for generation of 24 MW.

The Project comprises a 14.5 m high barrage, a rectangular fore-bay type power intake on the left bank, 5.6 m diameter horse shoe shaped head race tunnel of length 8.9 km, circular surge shaft of 22 m diameter & height 39.5 m, a single 200.0 m long 4.0 m diameter pressure shat/buried penstock, a surface power house housing 3 units of 8 MW. A 24 m long tail race channel conveys back into the existing reservoir of Nimo Bazgo HEP after power generation.

The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Nimu Chilling HEP

    • Site survey and investigations..
    • Review of the PFR prepared by JKSPDCL.
    • Review the Construction & Equipment Planning.
    • Preparation of Detailed Project Report as per AHEC/MnRE guidelines including study on alternatives
    • EIA/EMP report for availing NOC from State Pollution Control Board
    • Site specific seismic parameter studies by IIT-Delhi
    • Mathematical Modeling of the Reservoir Sedimentation

More Details

Sankoo HEP

 

 SANKOO

SANKOO HYDROELECTRIC PROJECT

CLIENT:
Jammu & Kashmir State Power Development Corporation Limited
LOCATION:
Kargil, Jammu & Kashmir
SCOPE OF SERVICES:

    AEMPL has been engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report for Sankoo HEP, Kargil as per the guidelines of Alternate Hydro Energy Centre, Ministry of New and Renewable Energy, Government of India
PROJECT DESCRIPTION:

Sankoo Hydro Electric Project has been contemplated as a run of the river scheme situated in the Kargil district of Jammu & Kashmir. The barrage site is located on River Suru. The Project will utilize a gross head of 58 m and design discharge of about 36 cumecs for generation of 19 MW.

The Project comprises a 10 m high barrage, a rectangular fore-bay type power intake on the left bank, Surface de-silting basin, 4.5 m diameter horse shoe shaped head race tunnel of length 1.9 km, circular surge shaft of 16 m diameter & height 53 m, a single 157 m long 3.5 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Suru housing 2 units of 9.25 MW. A 46 m long tail race channel conveys back into River Suru after power generation.

The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Sankoo HEP

    • Site survey and investigations.
    • Review of the PFR prepared by JKSPDCL.
    • Review the Construction & Equipment Planning.
    • Preparation of Detailed Project Report as per AHEC/MnRE guidelines including study on alternatives
    • EIA/EMP report for availing NOC from State Pollution Control Board
    • Mathematical Modeling of the Reservoir Sedimentation

More Details

Mangdam Sangra HEP

 

 MANGDAM

MANGDAM SANGRA HYDROELECTRIC PROJECT

CLIENT:
Jammu & Kashmir State Power Development Corporation Limited
LOCATION:
Kargil, Jammu & Kashmir
SCOPE OF SERVICES:

    AEMPL has been engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report for Mangdum Sangra HEP, Kargil as per the guidelines of Alternate Hydro Energy Centre, Ministry of New and Renewable Energy, Government of India.
PROJECT DESCRIPTION:

Mangdum Sangra Hydro Electric Project has been contemplated as a run of the river scheme situated in the Kargil district of Jammu & Kashmir. The barrage site is located on River Suru. The Project will utilize a gross head of 82.76 m and design discharge of about 27.70 cumecs for generation of 19 MW.

The Project comprises a 10 m high barrage, a rectangular fore-bay type power intake on the left bank, Surface de-silting basin, 4.0 m diameter horse shoe shaped head race tunnel of length 2.8 km, circular surge shaft of 10 m diameter & height 54 m, a single 358 m long 3.10 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Suru housing 2 units of 9.5 MW. A 60 m long tail race channel conveys back into River Suru after power generation.

The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Mangdum Sangra HEP

    • Site survey and investigations.
    • Review of the PFR prepared by JKSPDCL.
    • Review the Construction & Equipment Planning.
    • Preparation of Detailed Project Report as per AHEC/MnRE guidelines including study on alternatives
    • EIA/EMP report for availing NOC from State Pollution Control Board
    • Mathematical Modeling of the Reservoir Sedimentation

More Details

Durbuk Shyok HEP

 

 DURBUK

DURBUK SHYOK HYDROELECTRIC PROJECT

CLIENT:
Jammu & Kashmir State Power Development Corporation Limited
LOCATION:
Leh, Jammu & Kashmir
SCOPE OF SERVICES:

    AEMPL has been engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report for Durbuk Shyok HEP, Leh as per the guidelines of Alternate Hydro Energy Centre, Ministry of New and Renewable Energy, Government of India.
PROJECT DESCRIPTION:

Durbuk Shyok Hydro Electric Project has been contemplated as a run of the river scheme situated in the Leh district of Jammu & Kashmir. The barrage site is located on River Shyok Gong/Tnagtse Nala which is the left bank tributary of the Shyok River. The Project will utilize a gross head of 221.5 m and design discharge of about 12 cumecs for generation of 19 MW.

The Project comprises a 12 m high barrage, a rectangular fore-bay type power intake on the right bank, 3.0 m diameter horse shoe shaped head race tunnel of length 5.2 km, circular surge shaft of 6 m diameter & height 65.15 m, a single 940 m long 1.75 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Shyok housing 2 units of 9.5 MW. A 75 m long tail race channel conveys back into River Shyok after power generation.

The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Durbuk Shyok HEP

    • Site survey and investigations.
    • Review of the PFR prepared by JKSPDCL.
    • Review the Construction & Equipment Planning.
    • Preparation of Detailed Project Report as per AHEC/MnRE guidelines including study on alternatives
    • EIA/EMP report for availing NOC from State Pollution Control Board
    • Site specific seismic parameter studies by IIT-Delhi
    • Mathematical Modeling of the Reservoir Sedimentation

More Details

Bhilangna-IIB HEP

 Bhilangna

BHILANGNA-IIB SMALL HYDROELECTRIC PROJECT

CLIENT:
UJVN Limited, Uttarakhand.
LOCATION:
Tehri Garhwal District,Uttarakhand.
SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for the Review and Preparation of Detailed Project Report of Bhilangna-IIB Small Hydroelectric Project.
PROJECT DESCRIPTION:

Bhilangna-IIB SHEP is being developed by UJVN Limited, a Government of Uttarakhand enterprise.The project is proposed as a run-of-river scheme on the river Bhilangna in Tehri Garhwal District of Uttarakhand.

The project envisages construction of an ungated ogee weir across Bhilangna River to divert 24.93 cumecs flow into a water conductor system comprising Head Race Tunnel of size 3.5m, Horse-shoe shaped and 2.07km long; Surge Shaft of 11.0m dia and 38m high; Pressure Shaft of 2.8m dia and 62m long, Buried Penstock of same size and about 247m long, Branch Penstock of 1.6m dia and 35m long each and a surface Power House of size 45m (L) x 12.5m (W) x 27.0m (H) housing total three generating units of horizontal axis Francis Turbines. The flow after generation shall be diverted into River Bhilangna through a 6m wide tail race channel.

More Details

Sorang HEP

 Sorang

SORANG HYDROELECTRIC PROJECT

CLIENT:
Himachal Sorang Power Pvt. Ltd., Himachal Pradesh
LOCATION:
Nichar Tehsil, Kinnaur District, Himachal Pradesh
SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for the Review of Project Parameters and Design & Detailed Engineering Work of Penstock/ Pressure Shaft of Sorang Hydroelectric Project.
PROJECT DESCRIPTION:

Sorang Hydro Electric Project (2x50MW) is being developed by Himachal Sorang Power Private Limited (HSPL). The project was awarded to HSPL by Himachal State Electricity Board (HSEB). The project is located on Sorang Khad, a right bank tributary of the River Sutluj near Sorang Dongri Village in Kinnanur District of Himachal Pradesh.

The project envisages construction of a trench weir across Sorang Khad to divert 17.34 cumecs flow (2 units) into a water conductor system comprising Head Race Tunnel of size 3.2m x 4.0m, D-shaped and 1.45km long; Surge Shaft of 6.5m dia and 56.1m high; Surface Penstock of 3.25m dia and about 826m long followed by a steel lined Pressure Shaft of about 287m long and an underground Power House of size 79m (L) x 16.5m (W) x 39.5m (H) housing total three (presently two) generating units of Pelton Turbines. The flow after generation shall be diverted into River Sutluj through a 4.5×5.0 m D-shaped, 166 m long tail race tunnel.

More Details

Chatten HEP

 Chatten

CHATTEN SMALL HYDROELECTRIC PROJECT

CLIENT:

M/s N.T Lachenpa, Govt. Contractor, Sikkim Power Development Corporation Limited (SPDCL)

LOCATION:
Chatten Village, North District, Mangan, Sikkim
SCOPE OF SERVICES:

AEMPL engaged to provide Engineering Consultancy Services for Chatten Small Hydro Power Project which includes the following components detailed design and preparation of construction drawings. They are

    • 1. Trench Weir
    • 2. Intake Structure
    • 3. De-silting Tank
    • 4. Surge Shaft
    • 5. Y-Junction Penstock
    • 6. Power House
PROJECT DESCRIPTION:

Chatten Small Hydro Electric Project has been contemplated as a run of the river scheme situated in the Chatten Village, Mangan District, North Sikkim. The trench weir is located across Chyagachu River. The Project would utilize a net head of 258.74 m and design discharge of 1.5 Cumecs for generation of 3 MW.

The Project comprises of trench weir, 1 No. of intake channel along with De-silting arrangement on right bank of Chyagachu River, one number of head race pipe of 800mm (ID), 4m diameter surge tank, 1 no. of 429m long main surface penstock which bifurcates into two numbers of 40m long branch penstock, Surface power house housing 2 units of 1.5 MW and 1 No. of 1.5 (W) x 1.2 (H) m rectangular-shaped, 110m long Tail Race Channel.

More Details

Road Project – West Bengal

FOUR LANING ROAD PROJECT
CLIENT:

HCC Concessions Ltd.

 

LOCATION: 

West Bengal, India

SCOPE OF SERVICES:

AEMPL engaged to provide Consultancy Services for Contract Management and Dispute Resolution for the following Sections of NH-34 in West Bengal, India:

  1. Four Laning Road Project from Baharampore (191.416 Km) To Farakka (294.684 Km) Section of NH-34
  2. Four Laning Road Project From Farakka (295.00 Km) To Raiganj (398.00 Km) Section of NH-34
  3. Four Laning Road Project From Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34

In addition, AEMPL engaged to provide Engineering Consultancy Services for Review of Rate Analysis for Four Laning Road Project From Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34in West Bengal, India

PROJECT DESCRIPTION:

The Project is part of 3 contiguous road projects being executed by the HCC Group from Baharampore to Dalkhola (258.35 Km) along the NH34 in the state of West Bengal.

  • Baharampore (191.416 Km) To Farakka (294.684 Km) Section of NH-34 – Length of Four Lane – 100.6 Km
  • Farakka (295.00 Km) To Raiganj (398.00 Km) Section of NH-34 – Length of Four Lane – 103.00 Km
  • Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34 – Length of Four Lane – 54.75 Km

More Details

Road Project – Maharashtra

EXISTING TWO LANE SECTION OF NH-17 TO FOUR LANE


CLIENT:  HCC Ltd.
LOCATION:

 Mumbai, India

SCOPE OF SERVICES:

AEMPL engaged to provide Pre-tender Design Engineering Consultancy Services for existing two lane section of NH-17 to four lane for the following Sections in Maharashtra, India:

  • Rehabilitation and up gradation of Indapur to Veer (Wadpale) to Bhogaon Khurd section of NH-17(New NH No.66) from existing km 84/000 to km 108/000 (Design Ch. 84.000 to Ch 110.750) in the state of Maharashtra to four lanes with paved shoulders on EPC Mode under NHDP Phase IV.
  • Rehabilitation and up gradation of Veer (Wadpale) to Bhogaon Khurd section of NH-17(New NH No.66) from existing km 108/400 to km 148/0 (Design Ch. 110.750 to Ch 149.510) in the state of Maharashtra to four lanes with paved shoulders on EPC Mode under NHDP Phase IV.
  • PROJECT DESCRIPTION:

    The Project is part of 2 contiguous road projects from Indapur to Bhogaon Khurd (65.51 Km) along the NH-17 (New NH No.66) in the state of Maharashtra.

  • Indapur (84.000 Km) To Veer-Wadpale (110.750 Km) Section of NH-17 – Length of the proposed road – 26.75 Km
  • Veer-Wadpale (110.750 Km) To Bhogaon Khurd (149.510 Km) Section of NH-17 – Length of the proposed road – 38.76
  • Km

    More Details

    Rural Electrification Project (Uganda)

     

    AFD-FUNDED RURAL ELECTRIFICATION PROJECT

    CLIENT:

    Rural Electrification Board of Ministry of Energy & Mineral Development (MEMD), Kampala, Uganda

     LOCATION:

    North Western, Rwenzori, Western, Mid-Western, South and South Western Electricity Distribution Service Territories, Uganda

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for Project Management and Construction Supervision of 1556 km of Medium Voltage Lines and 1362 km of Low Voltage Network including Installation of Transformers in North Western, Rwenzori, Western, Mid-Western, and South & South Western Electricity Distribution Service Territories.

    PROJECT DESCRIPTION:

    The Project comprises construction of the following Medium Voltage Distribution Overhead Lines, associated LV reticulations and installation of 33/0.415 KV distribution transformers in Five (5) lots and they are:

    1. Lot 1: Hoima, Masindi, Kiryandongo & Kibale Environs Grid Extensions (approximately 288 km of Medium Voltage).
    2. Lot 2: Ntungamo, Kabale, Mbarara, Isingiro & Kiruhura Environs Grid-Extensions (approximately 297 km of Medium Voltage).
    3. Lot 3: Masaka, Lwengo, Sembabule, Lyantode, Rakai & Kiruhura Environs Grid- Extension lines (approximately 298 km of Medium Voltage).
    4. Lot 4: Bushenyi, Sheema, Mitooma & Buhweju Environs Grid-Extension Lines (approximately 263 km of Medium Voltage).
    5. Lot 5: Kasese, Rubirizi, Buhweju, Kabarole, Kyenjojo & Kibaale Environs Grid-Extension Lines (approximately 287 km of Medium Voltage).

    More Details

    Ayago HEP

     Ayago

    AYAGO HYDROELECTRIC PROJECT

    CLIENT:

    Ministry of Energy & Mineral Development (MEMD), The Republic of Uganda

    LOCATION:

    Murchison Falls National Park District, Uganda

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for the Review of the Detailed Feasibility Study and Supervision of the Construction of Ayago Hydro Power Project and its associated Transmission Interconnection.

    PROJECT DESCRIPTION:

    Ayago Hydro Electric Project has been contemplated as a run of the river scheme situated in the Murchison Falls National Park District of Uganda. The Diversion Dam is located across Nile River. The Project would utilize a head of 80 m and design discharge of 938 Cumecs for generation of 840 MW.

    The Project comprises of 24 m high Concrete Gravity dam, 6 Nos. of intake on left bank of Nile River feeding 6 Nos. of 6.6 m circular shaped pressure shaft, underground power house housing 6 units of 113.33 MW and 3 Nos. of 13 (W) x 15 (H) m D-shaped, 7.2 km long Tail Race Tunnel.

    More Details

    Malana – II HEP

    MalanaII

    MALANA – II HYDROELECTRIC PROJECT

    CLIENT:

    Everest Power Private Limited

    LOCATION:

    Kullu District, Himachal Pradesh, India

    SCOPE OF SERVICES:

    Aquagreen Engineering Management Pvt. Ltd. (AEMPL) providing the Engineering Consultancy Services for effective operation of plant including monitoring and post construction maintenance activities.

    PROJECT DESCRIPTION:

    Malana – II Hydro Electric Project (100 MW) consists of the following components:

    • A 45 m high concrete gravity dam of length 213 m including 63 m of key wall in the left bank.
    • One 2.9 m D-Shaped Head Race Tunnel of length 4.98 km to convey 20 cumecs for power generation
    • 6 m diameter circular simple type surge shaft of 80 m height.
    • A 2.5 m pressures shaft of length 758.60 m which includes top horizontal, vertical and bottom horizontal segments.
    • An underground power house housing 2 nos. of vertical axis Pelton turbines measuring 67.5 m (l) x 17.5 m (w) x 35.85 m (h).
    • A 5.4 m x 6.75 m D-shaped tail race tunnel of length 380 m.
    • The project utilizes a gross head of 602 m and design discharge of 20 cumecs to generate 409 MU of energy in 90 % dependable year.

    The Project is a high head, run-of-river project with 4 hour pondage and is located on Malana Khad, a tributary of the Parbati River, Himachal Pradesh. The Commercial Operation Date (COD) of the project was declared on 12th July 2012. AEMPL has involved in the preparation of post construction activities and monitoring which are required for effective operation.

    More Details

    Kynshi – I HEP

    KynshiI

    KYNSHI – I HYDROELECTRIC PROJECT

    CLIENT:

    Athena Kynshi Power Pvt. Ltd.

    LOCATION:

    Meghalaya, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for Preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract for 270 MW Kynshi – I HE Project, Meghalaya.

    PROJECT DESCRIPTION:

    Kynshi – I Hydro Electric Project has been contemplated as a run of the river scheme situated in the West Khasi Hills district of Meghalaya. The Dam site is located on River Kynshi, D/s of confluence of Umkyrtha River with Kynshi River. The Project will utilize a gross head of 581.00 m and design discharge of 54.86 cumecs for generation of 270MW.

    The Project comprises a 58.10 m high Concrete Gravity dam, two de-silting basins of 12 m X 21.5 m X 200 m; 6.89 km long 4.5 m diameter HRT, 67.5 m high 8.5 m diameter surge shaft, 1855 m long & 3.6 m diameter pressure tunnel including horizontal & vertical shaft. An underground power house housing 2 units of 135 MW. A 2.5 km long 5.25 m diameter tunnel conveys back the water back to River Kynshi after power generation. Design Energy is 1067 MU in 90% dependable year.

    More Details

    Mahama & Mpanga Irrigation Scheme

    MahamaMpanga

    MAHAMA & MPANGA IRRIGATION SCHEME

    CLIENT:

    WAPCOS Limited

    LOCATION:

    Eastern Province, Rwanda

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for Preparation of Detailed Project Report (DPR), Tender Design, Technical Specifications and assistance to WAPCOS for the Intake System Works for Irrigation Schemes in Mpanga and Mahama Sectors of Easter Province of Rwanda.

    PROJECT DESCRIPTION:

    The intake system of the Project involves construction of off-taking structures, head regulator, sedimentation tank, pump house, rising main and storage tank for irrigation from the River Akagera on the Rwanda – Tanzania border. The River has a minimum flow of 90 m3/s and a maximum discharge of 694 m3/s corresponding to return period flood of 1 in 40 years. The Project requires pumping of silt-free water to storage tank by construction of required number of off-tanking intake and its associated structures along the left bank of Kagera River covering Mpanga and Mahama Sectors.

    More Details

    Teesta – III HEP

     

     

    TeestaIII

    TEESTA – III HYDROELECTRIC PROJECT

    CLIENT:

    WAPCOS Limited

    LOCATION:

    North Sikkim, Sikkim, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Review Engineering Consultancy Services for 1200 MW Teesta – III HE Project, Sikkim and further provision of Design and Project Management Consultancy Services for Balance works of the project

    PROJECT DESCRIPTION:

    Teesta – III Hydro Electric Project has been contemplated as a run of the river scheme situated in the North Sikkim district of Sikkim. The Dam site is located on River Teesta just d/s of confluence of River Laching Chu and Lachung Chu. The Project will utilize a gross head of 817 m and design discharge of 175 cumecs for generation of 1200 MW.

     

    The Project comprises a 60 m high Concrete Faced Rockfill Dam, two de-silting basins of 17m X 23m X 320m; 14.3km long 7.5m diameter HRT, 15.5 m diameter circular surge shaft of 160m height, 1806.67m long & 2 nos. of 4m diameter pressure tunnels including vertical shaft and inclined shaft of length about 1650 m. An underground power house housing 6 units of 200 MW. A 1.2 km long 8.2×8.0 m tunnel conveys back the water back to River Teesta after power generation.

    The following works have been completed by M/s Aquagreen Engineering Management Private Limited for the Review Engineering during Construction Stage (2008-2010).

    • To study and evaluate the construction design/ drawing from the point of view of construction suitability to site condition.
    • Review the works under execution with the objective to achieve the scheduled progress.
    • Review the Construction & Equipment Planning.
    • Review the implementation of QA/ QC program implemented by the contractor and engineering agency.

    The following works are currently being executed by M/s Aquagreen Engineering Management Private Limited for the Design and Project Management Consultancy Services for Balance works (2015 – Ongoing)

    • Detailed Design Service for balance works
    • Construction supervision services on behalf of WAPCOS during execution of the Project including supervising construction, equipment installation and commissioning with a supervision team, undertaking quality assurance on the site and ,oversee the contractors’ quality control systems, provide expertise as needed on site on a case by case basis. Review the Construction & Equipment Planning.
    • Vetting of Contractor Claims for the Project
    • Preparation of DPR of Dam Toe Power House for the Project

    More Details

    Naba HEP

    Naba

    NABA HYDROELECTRIC PROJECT

    CLIENT:

    Andra Power Pvt. Ltd.

    LOCATION:

    Arunachal Pradesh, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Preparation Tender Documents of 1000 MW Naba Hydroelectric Project, Arunachal Pradesh and obtaining approval from statutory authorities.

    PROJECT DESCRIPTION:

    Naba H.E. Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about 870 m and FRL at the dam has been proposed at EL.1035 m. The Project will utilize a gross head of 245 m and design discharge of 468.22 cumecs for generation of 1000 MW.

    Naba H.E Project envisages a construction of a 167 m high concrete gravity dam with 2 Nos. of 11 m diameter diversion tunnels as diversion structure, 2 Nos. of power intake with trash rack arrangement, 2 Nos. of 3.1 km & 3.85 km long 8.7 m diameter head race tunnel, 2 Nos. of 23.0 m diameter surge shaft& 85 m high, 2 Nos. of 7.25 m diameter steel lined pressure shaft which include penstock of dia. 5.75 m on bifurcation. Underground power house housing 4 units of 250 MW each. Design Energy is 4249.42 MU in 90% dependable year.

    More Details

    Niare HEP

     Niare

    NIARE HYDROELECTRIC PROJECT

    CLIENT:

    Andra Power Pvt. Ltd.

    LOCATION:

    Arunachal Pradesh, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 800 MW NiareHE Project, Arunachal Pradesh and obtaining approval from statutory authorities.

    PROJECT DESCRIPTION:

    Niare H.E. Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about 1200 m and FRL at the dam has been proposed at EL.1280 m. The Project will utilize a gross head of 228 m and design discharge of 407.50Cumecs for generation of 800 MW.

    Niare H.E Project envisages of 101.56 m high concrete gravity dam with 2Nos. of11m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2Nos. of 3.14 km&3.10km long 8.50 m diameter head race tunnel, 2Nos. of 20.0 m diameter surge shaft&100m high, 2Nos. of 486.50mlong 7.25 m diameter steel lined pressure shaft which include penstock of dia. 5.50m on bifurcation. Underground power house housing4 units of 200 MW each. Design Energy is 3647.39MU in 90% dependable year.

    More Details

    Dengser HEP

    Dengser

    DENGSER HYDROELECTRIC PROJECT

    CLIENT:

    Arista Power Pvt. Ltd.

    LOCATION:

    Arunachal Pradesh, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 520 MW Dengser Hydro Electric Project, Arunachal Pradesh and obtaining approval from statutory authorities.

    PROJECT DESCRIPTION:

    Dengser Hydro Electric Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about EL. 531 m and FRL at the dam has been proposed at EL. 620 m. The Project will utilize a gross head of 126.63 m and design discharge of 470.90 cumecs for generation of 520 MW.

    Dengser H.E Project envisages of 121.19 m high concrete gravity dam with 2 Nos. of 11 m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2 Nos. of 5.11 km & 4.96 km long 9.20 m diameter head race tunnel, 2 Nos. of 25.0 m diameter surge shaft & 50 m high & 2 Nos. of 8.10 m diameter steel lined pressure shaft each of 324 m & 264 m in length which include penstock of dia. 4.57 m on bifurcation. Underground power house housing4 units of 130 MW each. Design Energy is 1986.92 MU in 90% dependable year.

    More Details

    Anjaw HEP

     Anjaw

    ANJAW HYDROELECTRIC PROJECT 


    CLIENT: Lohit Urja Power Pvt. Ltd.
    LOCATION:

    Anjaw District, Arunachal Pradesh, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract of 270 MW Anjaw HE Project, Arunachal Pradesh.

    PROJECT DESCRIPTION:

    The proposed project site is 335 km away from Dibrugarh which is nearest airport. The barrage site is located upstream of confluence of River Lohit & River Dau and surface Powerhouse is located on right bank of Lohit River at about 70 m downstream of the barrage.

    The average river bed level at the dam site is about EL 550.00 m and FRL at the dam has been proposed at EL 580.00 m. The project consist of 30.0 m high barrage of length 415 m, 7 nos. of 7 m dia. penstocks of length of about 50 m, surface powerhouse having 7 units of 38.5 MW. The project would generate 1146 MU in 90% dependable year.

    More Details

    Pemashelpu HEP

     Pemashelpu

    PEMASHELPU HYDROELECTRIC PROJECT

    CLIENT:

    Mechuka Hydro  Power Private Limited (Greenko Group)

    LOCATION:

    Arunachal Pradesh, India

    SCOPE OF SERVICES:

    Aquagreen Engineering Management Private Limited (AEMPL) provided complete Engineering and Project Management Services for all civil works associated with the 81 MW Pemashelpu Hydroelectric Project.

    PROJECT DESCRIPTION:

    The project is a run of river Hydroelectric project on the Yargyap Chu River, a major tributary of Siang River in West Siang District, Arunachal Pradesh. AEMPL was involved in preparation of Pre-feasibility, Feasibility and Detailed Project Report (DPR) which includes civil, hydro mechanical and electromechanical works and assistance in obtaining clearance from statutory authorities.

    More Details

    Demwe Lower HEP

     DemweLower

     DEMWE LOWER HYDROELECTRIC PROJECT

    CLIENT:

    Athena Demwe Power Pvt. Ltd.

    LOCATION:

    Lohit District, Arunachal Pradesh, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for Pre-construction stage investigations & Techno-economic optimization of the Project Layout, Detailed Design & Engineering Services during Project execution of 1750 MW Demwe Lower HE Project, Arunachal Pradesh

    PROJECT DESCRIPTION:

    Demwe Lower Hydro Electric Project has been contemplated as a run of the river scheme situated in the Lohit district of Arunachal Pradesh. The Dam site is located on River Lohit, upstream of Parasuram Kund. The Project will utilize a gross head of 120.00m and design discharge of 1729 cumecs for generation of 1750 MW.

    The Project comprises a 165 m high Concrete Gravity dam, five numbers of 10.0 m diameter pressure shafts of 450 to 600 m long. A surface power house housing 5 units of 342 MW each and one 40 MW. Design Energy is 6322 MU in 90% dependable year.

    More Details

    Demwe Upper HEP

     DemweUpper

    DEMWE UPPER HYDROELECTRIC PROJECT

    CLIENT:

    Lohit Urja Power Pvt. Ltd.

    LOCATION:

    Arunachal Pradesh, India

    SCOPE OF SERVICES:

    AEMPL engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract of 1080 MW Demwe Upper HE Project, Arunachal Pradesh.

    PROJECT DESCRIPTION:

    Demwe Upper HE Project is located in Anjaw District of Arunachal Pradesh on Lohit river. The proposed project site is 80 km away from Tezu which is District HQ of Lohit. The Dam site is located about 12.8 km downstream of confluence of Dalai River and underground Powerhouse is located on right bank of Lohit River at 150 m downstream of the dam axis.

    The average river bed level at the dam site is about EL 440.00 m and FRL at the dam has been proposed at EL 525.00 m. The project consist of 131.0 m high composite dam, 5 nos. of 10.0 m dia. pressure shaft length varies from 150.0 m to 285.0 m, an underground powerhouse having 5 units of 206 MW  and 1 unit of 50 MW. The project would generate 3991 MU in 90% dependable year.

    More Details