MANGDAM SANGRA HYDROELECTRIC PROJECT |
CLIENT: Jammu & Kashmir State Power Development Corporation Limited |
LOCATION: Kargil, Jammu & Kashmir |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Mangdum Sangra Hydro Electric Project has been contemplated as a run of the river scheme situated in the Kargil district of Jammu & Kashmir. The barrage site is located on River Suru. The Project will utilize a gross head of 82.76 m and design discharge of about 27.70 cumecs for generation of 19 MW. The Project comprises a 10 m high barrage, a rectangular fore-bay type power intake on the left bank, Surface de-silting basin, 4.0 m diameter horse shoe shaped head race tunnel of length 2.8 km, circular surge shaft of 10 m diameter & height 54 m, a single 358 m long 3.10 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Suru housing 2 units of 9.5 MW. A 60 m long tail race channel conveys back into River Suru after power generation. The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Mangdum Sangra HEP
|