NIARE HYDROELECTRIC PROJECT |
CLIENT:
Andra Power Pvt. Ltd. |
LOCATION:
Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 800 MW NiareHE Project, Arunachal Pradesh and obtaining approval from statutory authorities. |
PROJECT DESCRIPTION:
Niare H.E. Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about 1200 m and FRL at the dam has been proposed at EL.1280 m. The Project will utilize a gross head of 228 m and design discharge of 407.50Cumecs for generation of 800 MW. Niare H.E Project envisages of 101.56 m high concrete gravity dam with 2Nos. of11m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2Nos. of 3.14 km&3.10km long 8.50 m diameter head race tunnel, 2Nos. of 20.0 m diameter surge shaft&100m high, 2Nos. of 486.50mlong 7.25 m diameter steel lined pressure shaft which include penstock of dia. 5.50m on bifurcation. Underground power house housing4 units of 200 MW each. Design Energy is 3647.39MU in 90% dependable year. |
- Dengser HEP
- Naba HEP