Engineering consultancy for preparation of detailed design and drawings for the construction of river diversion arrangement, Trench weir, intake, HRT and Hydro mechanical equipment. |
PROJECT DESCRIPTION:
Tsibjalumchhu is a left bank tributary of River Wangchhu joining just downstream of Tala Dam. Tsibjalumchhu Diversion Scheme is the diversion of Tsibjalumchhu Nala to the existing Tala reservoir to augment generation from 1020 MW during lean flow season. The major component of the project consists of the following:
|
- Yamne – II HEP
- Simang – II HEP