Scope:
-
- To prepare the scope of works for topographical survey, geotechnical investigations, and laboratory tests as per CEA guidelines; and help the Owner in finalization of agencies for the above works. In addition, the consultant shall check the deliverables for their use in preparation of DPR.
- Assessment of Project’s Hydrology & power potential studies
- Assessment of Site Geology and Geological Mapping, & Preparation of Geological Maps required for completion of Geological chapter.
- Monitoring of surface and sub-surface explorations, Interpretation and Incorporation of data for studies of optimization of layout.
- DPR level Design of Civil Structures for various components of the Project.
- DPR level Design of Electro-mechanical works.
- Review of Site-Specific Seismic Parameter Study Report for the project including recommendations for the design.
- Review of details of construction materials availability, Engineering Properties and its test results and finalization of the same.
- Preparation of Construction Program and Plant Planning.
- Preparation of Construction Methodology.
- Preparation of Project Organization and Infrastructure facilities.
- Preparation of Detailed Cost Estimates for the project components of Civil, Hydro-Mechanical and Electro-Mechanical Works including Transmission line.
- Financial and Economic analysis of the project as per CERC guidelines.
- Preparation and Submission of Feasibility Report (FR) for Phase – 1, if required by CEA prior to submission of DPR.
- Preparation of Detailed Project Report as per CEA/CWC/GSI/CSMRS guidelines.
- Technical Assistance and presentations to Owner/CEA/CWC/Lenders/Lender’s Engineers till approval/ concurrence from the CEA/Statutory approvals.
|