Shendra Delhi Mumbai Industrial Corridor Corporation Limited |
|||||||||||||||||||||||||||||||||||||||
CLIENT:
CH2M Hill International Private Limited (India) |
|||||||||||||||||||||||||||||||||||||||
ULTIMATE CLIENT:
Delhi Mumbai Industrial Corridor Development Corporation Limited |
|||||||||||||||||||||||||||||||||||||||
LOCATION:
Maharashtra, India |
|||||||||||||||||||||||||||||||||||||||
SCOPE OF SERVICES:
Construction Supervision of civil and electrical works; Contract Management including all aspects related to techical and commercial aspects. Project Planning, Monitoring, Control and Scheduling. |
|||||||||||||||||||||||||||||||||||||||
PROJECT DESCRIPTION:
Shendra Bidkin Industrial Area (SBIA) is located at a distance of approximately 15 km from downtown Aurangabad and is 8 km east of the Aurangabad Airport. It is planned as a new industrial corridor extending from the existing Maharashtra Industrial Development Corporation’s (MIDC) Shendra Industrial Park to the town of Bidkin. The total area of SBIA admeasuring 84.17 sq. km has been divided into two parts viz. Part-I and Part-II. The Part-I consisting of area of 41.42 sq. km, which is further divided into two parts, viz. Phase-I and Phase-II. The Phase-I covers an area of 8.39 sq. km located north of Jalna Road adjoining existing MIDC Shendra Industrial Park. Phase-II includes the remaining area of 32.03 sq. km located near Bidkin. The development of the Part-II of SBIA consisting of total area of 42.75 sq. km will be taken up at the later stage. PROJECT CHARACTERISTICS:
|
Author: admin
Bidkin – DMICCL
|
|||||||||||||||||||||||||||||||||||||||
BDKIN Delhi Mumbai Industrial Corridor Corporation Limited | |||||||||||||||||||||||||||||||||||||||
CLIENT:
CH2M Hill International Private Limited (India) |
|||||||||||||||||||||||||||||||||||||||
ULTIMATE CLIENT:
Delhi Mumbai Industrial Corridor Development Corporation Limited |
|||||||||||||||||||||||||||||||||||||||
LOCATION:
Maharashtra, India |
|||||||||||||||||||||||||||||||||||||||
SCOPE OF SERVICES:
Construction Supervision of civil and electrical works; Contract Management including all aspects related to technical and commercial aspects. Project Planning, Monitoring, Control and Scheduling. |
|||||||||||||||||||||||||||||||||||||||
PROJECT DESCRIPTION:
Shendra Bidkin Industrial Area (SBIA) is located at a distance of approximately 15 km from downtown Aurangabad and is 8 km east of the Aurangabad Airport. It is planned as a new industrial corridor extending from the existing Maharashtra Industrial Development Corporation’s (MIDC) Shendra Industrial Park to the town of Bidkin. The total area of SBIA admeasuring 84.17 sq. km has been divided into two parts viz. Part-I and Part-II. The Part-I consisting of area of 41.42 sq. km, which is further divided into two parts, viz. Phase-I and Phase-II. The Phase-I covers an area of 8.39 sq. km located north of Jalna Road adjoining existing MIDC Shendra Industrial Park. Phase-II includes the remaining area of 32.03 sq. km located near Bidkin. The development of the Part-II of SBIA consisting of total area of 42.75 sq. km will be taken up at the later stage. Project Characteristics:
|
Karnah – JKSPDCL
KARNAH HYDRO ELECTRIC PROJECT |
CLIENT:
Jammu and Kashmir State Power Development Corporation Limited |
LOCATION:
Kashmir, India |
SCOPE OF SERVICES:
Review of contractor’s design, Supervision of construction of Civil, Hydro Mechanical/ Electromechanical works. Supervision of manufacture of equipment, Management of contractor’s claims, Assurance of Quality control. |
PROJECT DESCRIPTION:
The J&K State Power Development Corporation intends to implement 12 MW Karnah Hydro Electric Project under Prime Minister’s Development Package -2015 (PMDP-2015) in Jammu and Kashmir State. The Karnah Hydroelectric Power Project (12 MW) with Installed capacity of 3×4 MW is situated at the stream named Quazi Nag at the Basin of Kishan Ganga near village Khudri in Tehsil- Karnah, District-Kupwara, Jammu & Kashmir corresponding to a design discharge of 13.47 cumecs and design head of 98.58 m. PROJECT CHARACTERISTICS:
|
Kondhane – CIDCO
KONDHANE – CIDCO IRRIGATION SCHEME |
CLIENT:
City and Industrial Development Corporation |
LOCATION:
Maharashtra, India |
SCOPE OF SERVICES:
Scope of Work includes Preparation of Detailed Project Report (DPR) including outlet arrangement for irrigation and water supply / hydro Power with intake structure and captive hydro power plant. In Design Phase:- Project Engineering, Geology, Cost Estimation and Drawings volumes including salient features, survey and investigations, hydrology, design of civil structures, electro-mechanical and hydro-mechanical design, financial evaluation of the project acceptable to the relevant regulatory authorities. Preparation of R & R plan and obtaining statutory clearance from all the concerned departments for taking up the project. Preparation of bid document and its evaluation. Preparation of the Construction drawing for execution, scrutiny of variations, study of time cost overrun and periodic inspection of the execution of work. |
PROJECT DESCRIPTION:
Kondhane Dam Project is primarily a drinking water Project located near the village Kondhane in Maharashtra. Project was envisaged to meet the increasing demand of drinking water for the city of Navi Mumbai. City and Industrial Development Corporation of Maharashtra (CIDCO), a wholly owned company of govt. of Maharashtra, is the planning and the development authority of city of Navi Mumbai which is spread over an area of 344 sq. km. PROJECT CHARACTERISTICS: The project envisages construction of 74 m high Concrete Faced Rock Fill Dam (CFRD) and outlet arrangement for irrigation and water supply / hydro power with intake structure and captive hydro power plant. The capacity of the reservoir shall be 105.97 MCM out of which 10.55 MCM shall be released for irrigation purpose. |
LPG & POL Cross country Pipeline
LPG & POL Cross country Pipeline at VIZAG Terminal |
PROJECT OWNER: EAST INDIA PETROLEUM LIMITED |
LOCATION:
Visakhapatnam, Andhra Pradesh |
SCOPE OF SERVICES: Jetty Area Scope of Work:
The LPG cross-country pipeline process design.
Piping & instrumentation drawing (P&ID) and equipment Layouts
Design of the civil and electrical works
|
PROJECT DESCRIPTION:
The project involves setting up off offloading facilities of LPG from transportation vessels at the Jetty area and subsequently transferred to storage facility, through the network piping of length 8.4KM. |
CSR Policy
CSR Policy
Extract of Annual Return/18
EXTRACT OF ANNUAL RETURN/18
Coastal Road Project – Mumbai
This Page is Under Renovation
Nimu Chilling HEP
NIMU CHILLING HYDROELECTRIC PROJECT |
CLIENT: Jammu & Kashmir State Power Development Corporation Limited |
LOCATION: Leh, Jammu & Kashmir |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Nimu Chilling Hydro Electric Project has been contemplated as a run of the river scheme situated in the Leh district of Jammu & Kashmir. The barrage site is located on River Zanskar just before its confluence with the mighty Indus River. The Project will utilize a gross head of 45 m and design discharge of about 59 cumecs for generation of 24 MW. The Project comprises a 14.5 m high barrage, a rectangular fore-bay type power intake on the left bank, 5.6 m diameter horse shoe shaped head race tunnel of length 8.9 km, circular surge shaft of 22 m diameter & height 39.5 m, a single 200.0 m long 4.0 m diameter pressure shat/buried penstock, a surface power house housing 3 units of 8 MW. A 24 m long tail race channel conveys back into the existing reservoir of Nimo Bazgo HEP after power generation. The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Nimu Chilling HEP
|
Sankoo HEP
SANKOO HYDROELECTRIC PROJECT |
CLIENT: Jammu & Kashmir State Power Development Corporation Limited |
LOCATION: Kargil, Jammu & Kashmir |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Sankoo Hydro Electric Project has been contemplated as a run of the river scheme situated in the Kargil district of Jammu & Kashmir. The barrage site is located on River Suru. The Project will utilize a gross head of 58 m and design discharge of about 36 cumecs for generation of 19 MW. The Project comprises a 10 m high barrage, a rectangular fore-bay type power intake on the left bank, Surface de-silting basin, 4.5 m diameter horse shoe shaped head race tunnel of length 1.9 km, circular surge shaft of 16 m diameter & height 53 m, a single 157 m long 3.5 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Suru housing 2 units of 9.25 MW. A 46 m long tail race channel conveys back into River Suru after power generation. The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Sankoo HEP
|
Mangdam Sangra HEP
MANGDAM SANGRA HYDROELECTRIC PROJECT |
CLIENT: Jammu & Kashmir State Power Development Corporation Limited |
LOCATION: Kargil, Jammu & Kashmir |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Mangdum Sangra Hydro Electric Project has been contemplated as a run of the river scheme situated in the Kargil district of Jammu & Kashmir. The barrage site is located on River Suru. The Project will utilize a gross head of 82.76 m and design discharge of about 27.70 cumecs for generation of 19 MW. The Project comprises a 10 m high barrage, a rectangular fore-bay type power intake on the left bank, Surface de-silting basin, 4.0 m diameter horse shoe shaped head race tunnel of length 2.8 km, circular surge shaft of 10 m diameter & height 54 m, a single 358 m long 3.10 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Suru housing 2 units of 9.5 MW. A 60 m long tail race channel conveys back into River Suru after power generation. The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Mangdum Sangra HEP
|
Durbuk Shyok HEP
DURBUK SHYOK HYDROELECTRIC PROJECT |
CLIENT: Jammu & Kashmir State Power Development Corporation Limited |
LOCATION: Leh, Jammu & Kashmir |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Durbuk Shyok Hydro Electric Project has been contemplated as a run of the river scheme situated in the Leh district of Jammu & Kashmir. The barrage site is located on River Shyok Gong/Tnagtse Nala which is the left bank tributary of the Shyok River. The Project will utilize a gross head of 221.5 m and design discharge of about 12 cumecs for generation of 19 MW. The Project comprises a 12 m high barrage, a rectangular fore-bay type power intake on the right bank, 3.0 m diameter horse shoe shaped head race tunnel of length 5.2 km, circular surge shaft of 6 m diameter & height 65.15 m, a single 940 m long 1.75 m diameter pressure shat/buried penstock, a surface power house on the left bank of River Shyok housing 2 units of 9.5 MW. A 75 m long tail race channel conveys back into River Shyok after power generation. The following works have been completed by M/s Aquagreen Engineering Management Private Limited for Durbuk Shyok HEP
|
Bhilangna-IIB HEP
BHILANGNA-IIB SMALL HYDROELECTRIC PROJECT |
CLIENT: UJVN Limited, Uttarakhand. |
LOCATION: Tehri Garhwal District,Uttarakhand. |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Bhilangna-IIB SHEP is being developed by UJVN Limited, a Government of Uttarakhand enterprise.The project is proposed as a run-of-river scheme on the river Bhilangna in Tehri Garhwal District of Uttarakhand. The project envisages construction of an ungated ogee weir across Bhilangna River to divert 24.93 cumecs flow into a water conductor system comprising Head Race Tunnel of size 3.5m, Horse-shoe shaped and 2.07km long; Surge Shaft of 11.0m dia and 38m high; Pressure Shaft of 2.8m dia and 62m long, Buried Penstock of same size and about 247m long, Branch Penstock of 1.6m dia and 35m long each and a surface Power House of size 45m (L) x 12.5m (W) x 27.0m (H) housing total three generating units of horizontal axis Francis Turbines. The flow after generation shall be diverted into River Bhilangna through a 6m wide tail race channel. |
Sorang HEP
SORANG HYDROELECTRIC PROJECT |
CLIENT: Himachal Sorang Power Pvt. Ltd., Himachal Pradesh |
LOCATION: Nichar Tehsil, Kinnaur District, Himachal Pradesh |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Sorang Hydro Electric Project (2x50MW) is being developed by Himachal Sorang Power Private Limited (HSPL). The project was awarded to HSPL by Himachal State Electricity Board (HSEB). The project is located on Sorang Khad, a right bank tributary of the River Sutluj near Sorang Dongri Village in Kinnanur District of Himachal Pradesh. The project envisages construction of a trench weir across Sorang Khad to divert 17.34 cumecs flow (2 units) into a water conductor system comprising Head Race Tunnel of size 3.2m x 4.0m, D-shaped and 1.45km long; Surge Shaft of 6.5m dia and 56.1m high; Surface Penstock of 3.25m dia and about 826m long followed by a steel lined Pressure Shaft of about 287m long and an underground Power House of size 79m (L) x 16.5m (W) x 39.5m (H) housing total three (presently two) generating units of Pelton Turbines. The flow after generation shall be diverted into River Sutluj through a 4.5×5.0 m D-shaped, 166 m long tail race tunnel. |
Chatten HEP
CHATTEN SMALL HYDROELECTRIC PROJECT |
CLIENT:
M/s N.T Lachenpa, Govt. Contractor, Sikkim Power Development Corporation Limited (SPDCL) |
LOCATION: Chatten Village, North District, Mangan, Sikkim |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Chatten Small Hydro Power Project which includes the following components detailed design and preparation of construction drawings. They are
|
PROJECT DESCRIPTION:
Chatten Small Hydro Electric Project has been contemplated as a run of the river scheme situated in the Chatten Village, Mangan District, North Sikkim. The trench weir is located across Chyagachu River. The Project would utilize a net head of 258.74 m and design discharge of 1.5 Cumecs for generation of 3 MW. The Project comprises of trench weir, 1 No. of intake channel along with De-silting arrangement on right bank of Chyagachu River, one number of head race pipe of 800mm (ID), 4m diameter surge tank, 1 no. of 429m long main surface penstock which bifurcates into two numbers of 40m long branch penstock, Surface power house housing 2 units of 1.5 MW and 1 No. of 1.5 (W) x 1.2 (H) m rectangular-shaped, 110m long Tail Race Channel. |
Road Project – West Bengal
|
FOUR LANING ROAD PROJECT |
CLIENT:
HCC Concessions Ltd.
|
LOCATION:
West Bengal, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Consultancy Services for Contract Management and Dispute Resolution for the following Sections of NH-34 in West Bengal, India:
In addition, AEMPL engaged to provide Engineering Consultancy Services for Review of Rate Analysis for Four Laning Road Project From Raiganj (398.00 Km) To Dalkhola (452.750 Km) Section of NH-34in West Bengal, India |
PROJECT DESCRIPTION:
The Project is part of 3 contiguous road projects being executed by the HCC Group from Baharampore to Dalkhola (258.35 Km) along the NH34 in the state of West Bengal.
|
Road Project – Maharashtra
EXISTING TWO LANE SECTION OF NH-17 TO FOUR LANE |
CLIENT: HCC Ltd. |
LOCATION:
Mumbai, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Pre-tender Design Engineering Consultancy Services for existing two lane section of NH-17 to four lane for the following Sections in Maharashtra, India: |
PROJECT DESCRIPTION:
The Project is part of 2 contiguous road projects from Indapur to Bhogaon Khurd (65.51 Km) along the NH-17 (New NH No.66) in the state of Maharashtra. Km |
Rural Electrification Project (Uganda)
Ayago HEP
AYAGO HYDROELECTRIC PROJECT |
CLIENT:
Ministry of Energy & Mineral Development (MEMD), The Republic of Uganda |
LOCATION:
Murchison Falls National Park District, Uganda |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for the Review of the Detailed Feasibility Study and Supervision of the Construction of Ayago Hydro Power Project and its associated Transmission Interconnection. |
PROJECT DESCRIPTION:
Ayago Hydro Electric Project has been contemplated as a run of the river scheme situated in the Murchison Falls National Park District of Uganda. The Diversion Dam is located across Nile River. The Project would utilize a head of 80 m and design discharge of 938 Cumecs for generation of 840 MW. The Project comprises of 24 m high Concrete Gravity dam, 6 Nos. of intake on left bank of Nile River feeding 6 Nos. of 6.6 m circular shaped pressure shaft, underground power house housing 6 units of 113.33 MW and 3 Nos. of 13 (W) x 15 (H) m D-shaped, 7.2 km long Tail Race Tunnel. |
Malana – II HEP
|
MALANA – II HYDROELECTRIC PROJECT |
CLIENT:
Everest Power Private Limited |
LOCATION:
Kullu District, Himachal Pradesh, India |
SCOPE OF SERVICES:
Aquagreen Engineering Management Pvt. Ltd. (AEMPL) providing the Engineering Consultancy Services for effective operation of plant including monitoring and post construction maintenance activities. |
PROJECT DESCRIPTION:
Malana – II Hydro Electric Project (100 MW) consists of the following components:
The Project is a high head, run-of-river project with 4 hour pondage and is located on Malana Khad, a tributary of the Parbati River, Himachal Pradesh. The Commercial Operation Date (COD) of the project was declared on 12th July 2012. AEMPL has involved in the preparation of post construction activities and monitoring which are required for effective operation. |
Kynshi – I HEP
|
KYNSHI – I HYDROELECTRIC PROJECT |
CLIENT:
Athena Kynshi Power Pvt. Ltd. |
LOCATION:
Meghalaya, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract for 270 MW Kynshi – I HE Project, Meghalaya. |
PROJECT DESCRIPTION:
Kynshi – I Hydro Electric Project has been contemplated as a run of the river scheme situated in the West Khasi Hills district of Meghalaya. The Dam site is located on River Kynshi, D/s of confluence of Umkyrtha River with Kynshi River. The Project will utilize a gross head of 581.00 m and design discharge of 54.86 cumecs for generation of 270MW. The Project comprises a 58.10 m high Concrete Gravity dam, two de-silting basins of 12 m X 21.5 m X 200 m; 6.89 km long 4.5 m diameter HRT, 67.5 m high 8.5 m diameter surge shaft, 1855 m long & 3.6 m diameter pressure tunnel including horizontal & vertical shaft. An underground power house housing 2 units of 135 MW. A 2.5 km long 5.25 m diameter tunnel conveys back the water back to River Kynshi after power generation. Design Energy is 1067 MU in 90% dependable year. |
Mahama & Mpanga Irrigation Scheme
MAHAMA & MPANGA IRRIGATION SCHEME |
CLIENT:
WAPCOS Limited |
LOCATION:
Eastern Province, Rwanda |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Preparation of Detailed Project Report (DPR), Tender Design, Technical Specifications and assistance to WAPCOS for the Intake System Works for Irrigation Schemes in Mpanga and Mahama Sectors of Easter Province of Rwanda. |
PROJECT DESCRIPTION:
The intake system of the Project involves construction of off-taking structures, head regulator, sedimentation tank, pump house, rising main and storage tank for irrigation from the River Akagera on the Rwanda – Tanzania border. The River has a minimum flow of 90 m3/s and a maximum discharge of 694 m3/s corresponding to return period flood of 1 in 40 years. The Project requires pumping of silt-free water to storage tank by construction of required number of off-tanking intake and its associated structures along the left bank of Kagera River covering Mpanga and Mahama Sectors. |
Teesta – III HEP
TEESTA – III HYDROELECTRIC PROJECT |
CLIENT:
WAPCOS Limited |
LOCATION:
North Sikkim, Sikkim, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Review Engineering Consultancy Services for 1200 MW Teesta – III HE Project, Sikkim and further provision of Design and Project Management Consultancy Services for Balance works of the project |
PROJECT DESCRIPTION:
Teesta – III Hydro Electric Project has been contemplated as a run of the river scheme situated in the North Sikkim district of Sikkim. The Dam site is located on River Teesta just d/s of confluence of River Laching Chu and Lachung Chu. The Project will utilize a gross head of 817 m and design discharge of 175 cumecs for generation of 1200 MW.
The Project comprises a 60 m high Concrete Faced Rockfill Dam, two de-silting basins of 17m X 23m X 320m; 14.3km long 7.5m diameter HRT, 15.5 m diameter circular surge shaft of 160m height, 1806.67m long & 2 nos. of 4m diameter pressure tunnels including vertical shaft and inclined shaft of length about 1650 m. An underground power house housing 6 units of 200 MW. A 1.2 km long 8.2×8.0 m tunnel conveys back the water back to River Teesta after power generation. The following works have been completed by M/s Aquagreen Engineering Management Private Limited for the Review Engineering during Construction Stage (2008-2010).
The following works are currently being executed by M/s Aquagreen Engineering Management Private Limited for the Design and Project Management Consultancy Services for Balance works (2015 – Ongoing)
|
Naba HEP
|
NABA HYDROELECTRIC PROJECT |
CLIENT:
Andra Power Pvt. Ltd. |
LOCATION:
Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Preparation Tender Documents of 1000 MW Naba Hydroelectric Project, Arunachal Pradesh and obtaining approval from statutory authorities. |
PROJECT DESCRIPTION:
Naba H.E. Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about 870 m and FRL at the dam has been proposed at EL.1035 m. The Project will utilize a gross head of 245 m and design discharge of 468.22 cumecs for generation of 1000 MW. Naba H.E Project envisages a construction of a 167 m high concrete gravity dam with 2 Nos. of 11 m diameter diversion tunnels as diversion structure, 2 Nos. of power intake with trash rack arrangement, 2 Nos. of 3.1 km & 3.85 km long 8.7 m diameter head race tunnel, 2 Nos. of 23.0 m diameter surge shaft& 85 m high, 2 Nos. of 7.25 m diameter steel lined pressure shaft which include penstock of dia. 5.75 m on bifurcation. Underground power house housing 4 units of 250 MW each. Design Energy is 4249.42 MU in 90% dependable year. |
Niare HEP
NIARE HYDROELECTRIC PROJECT |
CLIENT:
Andra Power Pvt. Ltd. |
LOCATION:
Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 800 MW NiareHE Project, Arunachal Pradesh and obtaining approval from statutory authorities. |
PROJECT DESCRIPTION:
Niare H.E. Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about 1200 m and FRL at the dam has been proposed at EL.1280 m. The Project will utilize a gross head of 228 m and design discharge of 407.50Cumecs for generation of 800 MW. Niare H.E Project envisages of 101.56 m high concrete gravity dam with 2Nos. of11m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2Nos. of 3.14 km&3.10km long 8.50 m diameter head race tunnel, 2Nos. of 20.0 m diameter surge shaft&100m high, 2Nos. of 486.50mlong 7.25 m diameter steel lined pressure shaft which include penstock of dia. 5.50m on bifurcation. Underground power house housing4 units of 200 MW each. Design Energy is 3647.39MU in 90% dependable year. |
Dengser HEP
|
DENGSER HYDROELECTRIC PROJECT |
CLIENT:
Arista Power Pvt. Ltd. |
LOCATION:
Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 520 MW Dengser Hydro Electric Project, Arunachal Pradesh and obtaining approval from statutory authorities. |
PROJECT DESCRIPTION:
Dengser Hydro Electric Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about EL. 531 m and FRL at the dam has been proposed at EL. 620 m. The Project will utilize a gross head of 126.63 m and design discharge of 470.90 cumecs for generation of 520 MW. Dengser H.E Project envisages of 121.19 m high concrete gravity dam with 2 Nos. of 11 m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2 Nos. of 5.11 km & 4.96 km long 9.20 m diameter head race tunnel, 2 Nos. of 25.0 m diameter surge shaft & 50 m high & 2 Nos. of 8.10 m diameter steel lined pressure shaft each of 324 m & 264 m in length which include penstock of dia. 4.57 m on bifurcation. Underground power house housing4 units of 130 MW each. Design Energy is 1986.92 MU in 90% dependable year. |
Anjaw HEP
ANJAW HYDROELECTRIC PROJECT |
CLIENT: Lohit Urja Power Pvt. Ltd. |
LOCATION:
Anjaw District, Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract of 270 MW Anjaw HE Project, Arunachal Pradesh. |
PROJECT DESCRIPTION:
The proposed project site is 335 km away from Dibrugarh which is nearest airport. The barrage site is located upstream of confluence of River Lohit & River Dau and surface Powerhouse is located on right bank of Lohit River at about 70 m downstream of the barrage. The average river bed level at the dam site is about EL 550.00 m and FRL at the dam has been proposed at EL 580.00 m. The project consist of 30.0 m high barrage of length 415 m, 7 nos. of 7 m dia. penstocks of length of about 50 m, surface powerhouse having 7 units of 38.5 MW. The project would generate 1146 MU in 90% dependable year. |
Pemashelpu HEP
PEMASHELPU HYDROELECTRIC PROJECT |
CLIENT:
Mechuka Hydro Power Private Limited (Greenko Group) |
LOCATION:
Arunachal Pradesh, India |
SCOPE OF SERVICES:
Aquagreen Engineering Management Private Limited (AEMPL) provided complete Engineering and Project Management Services for all civil works associated with the 81 MW Pemashelpu Hydroelectric Project. |
PROJECT DESCRIPTION:
The project is a run of river Hydroelectric project on the Yargyap Chu River, a major tributary of Siang River in West Siang District, Arunachal Pradesh. AEMPL was involved in preparation of Pre-feasibility, Feasibility and Detailed Project Report (DPR) which includes civil, hydro mechanical and electromechanical works and assistance in obtaining clearance from statutory authorities. |
Demwe Lower HEP
DEMWE LOWER HYDROELECTRIC PROJECT |
CLIENT:
Athena Demwe Power Pvt. Ltd. |
LOCATION:
Lohit District, Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Pre-construction stage investigations & Techno-economic optimization of the Project Layout, Detailed Design & Engineering Services during Project execution of 1750 MW Demwe Lower HE Project, Arunachal Pradesh |
PROJECT DESCRIPTION:
Demwe Lower Hydro Electric Project has been contemplated as a run of the river scheme situated in the Lohit district of Arunachal Pradesh. The Dam site is located on River Lohit, upstream of Parasuram Kund. The Project will utilize a gross head of 120.00m and design discharge of 1729 cumecs for generation of 1750 MW. The Project comprises a 165 m high Concrete Gravity dam, five numbers of 10.0 m diameter pressure shafts of 450 to 600 m long. A surface power house housing 5 units of 342 MW each and one 40 MW. Design Energy is 6322 MU in 90% dependable year. |
Demwe Upper HEP
|
DEMWE UPPER HYDROELECTRIC PROJECT |
CLIENT:
Lohit Urja Power Pvt. Ltd. |
LOCATION:
Arunachal Pradesh, India |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract of 1080 MW Demwe Upper HE Project, Arunachal Pradesh. |
PROJECT DESCRIPTION:
Demwe Upper HE Project is located in Anjaw District of Arunachal Pradesh on Lohit river. The proposed project site is 80 km away from Tezu which is District HQ of Lohit. The Dam site is located about 12.8 km downstream of confluence of Dalai River and underground Powerhouse is located on right bank of Lohit River at 150 m downstream of the dam axis. The average river bed level at the dam site is about EL 440.00 m and FRL at the dam has been proposed at EL 525.00 m. The project consist of 131.0 m high composite dam, 5 nos. of 10.0 m dia. pressure shaft length varies from 150.0 m to 285.0 m, an underground powerhouse having 5 units of 206 MW and 1 unit of 50 MW. The project would generate 3991 MU in 90% dependable year. |