BHILANGNA-IIB SMALL HYDROELECTRIC PROJECT |
CLIENT: UJVN Limited, Uttarakhand. |
LOCATION: Tehri Garhwal District,Uttarakhand. |
SCOPE OF SERVICES:
|
PROJECT DESCRIPTION:
Bhilangna-IIB SHEP is being developed by UJVN Limited, a Government of Uttarakhand enterprise.The project is proposed as a run-of-river scheme on the river Bhilangna in Tehri Garhwal District of Uttarakhand. The project envisages construction of an ungated ogee weir across Bhilangna River to divert 24.93 cumecs flow into a water conductor system comprising Head Race Tunnel of size 3.5m, Horse-shoe shaped and 2.07km long; Surge Shaft of 11.0m dia and 38m high; Pressure Shaft of 2.8m dia and 62m long, Buried Penstock of same size and about 247m long, Branch Penstock of 1.6m dia and 35m long each and a surface Power House of size 45m (L) x 12.5m (W) x 27.0m (H) housing total three generating units of horizontal axis Francis Turbines. The flow after generation shall be diverted into River Bhilangna through a 6m wide tail race channel. |
- Sorang HEP
- Durbuk Shyok HEP