DENGSER HYDROELECTRIC PROJECT |
| CLIENT:
Arista Power Pvt. Ltd. |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR) of 520 MW Dengser Hydro Electric Project, Arunachal Pradesh and obtaining approval from statutory authorities. |
| PROJECT DESCRIPTION:
Dengser Hydro Electric Project is located in upper reaches of Subansiri River, Arunachal Pradesh. The average river bed level at the dam site is about EL. 531 m and FRL at the dam has been proposed at EL. 620 m. The Project will utilize a gross head of 126.63 m and design discharge of 470.90 cumecs for generation of 520 MW. Dengser H.E Project envisages of 121.19 m high concrete gravity dam with 2 Nos. of 11 m diameter diversion tunnels as diversion structure, 2Nos of power intake with trash rack arrangement, 2 Nos. of 5.11 km & 4.96 km long 9.20 m diameter head race tunnel, 2 Nos. of 25.0 m diameter surge shaft & 50 m high & 2 Nos. of 8.10 m diameter steel lined pressure shaft each of 324 m & 264 m in length which include penstock of dia. 4.57 m on bifurcation. Underground power house housing4 units of 130 MW each. Design Energy is 1986.92 MU in 90% dependable year. |
Author: admin
Anjaw HEP
![]() |
|
ANJAW HYDROELECTRIC PROJECT |
CLIENT: Lohit Urja Power Pvt. Ltd. |
| LOCATION:
Anjaw District, Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract of 270 MW Anjaw HE Project, Arunachal Pradesh. |
| PROJECT DESCRIPTION:
The proposed project site is 335 km away from Dibrugarh which is nearest airport. The barrage site is located upstream of confluence of River Lohit & River Dau and surface Powerhouse is located on right bank of Lohit River at about 70 m downstream of the barrage. The average river bed level at the dam site is about EL 550.00 m and FRL at the dam has been proposed at EL 580.00 m. The project consist of 30.0 m high barrage of length 415 m, 7 nos. of 7 m dia. penstocks of length of about 50 m, surface powerhouse having 7 units of 38.5 MW. The project would generate 1146 MU in 90% dependable year. |
Pemashelpu HEP
![]() |
|
PEMASHELPU HYDROELECTRIC PROJECT |
| CLIENT:
Mechuka Hydro Power Private Limited (Greenko Group) |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
Aquagreen Engineering Management Private Limited (AEMPL) provided complete Engineering and Project Management Services for all civil works associated with the 81 MW Pemashelpu Hydroelectric Project. |
| PROJECT DESCRIPTION:
The project is a run of river Hydroelectric project on the Yargyap Chu River, a major tributary of Siang River in West Siang District, Arunachal Pradesh. AEMPL was involved in preparation of Pre-feasibility, Feasibility and Detailed Project Report (DPR) which includes civil, hydro mechanical and electromechanical works and assistance in obtaining clearance from statutory authorities. |
Demwe Lower HEP
![]() |
|
DEMWE LOWER HYDROELECTRIC PROJECT |
| CLIENT:
Athena Demwe Power Pvt. Ltd. |
| LOCATION:
Lohit District, Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Pre-construction stage investigations & Techno-economic optimization of the Project Layout, Detailed Design & Engineering Services during Project execution of 1750 MW Demwe Lower HE Project, Arunachal Pradesh |
| PROJECT DESCRIPTION:
Demwe Lower Hydro Electric Project has been contemplated as a run of the river scheme situated in the Lohit district of Arunachal Pradesh. The Dam site is located on River Lohit, upstream of Parasuram Kund. The Project will utilize a gross head of 120.00m and design discharge of 1729 cumecs for generation of 1750 MW. The Project comprises a 165 m high Concrete Gravity dam, five numbers of 10.0 m diameter pressure shafts of 450 to 600 m long. A surface power house housing 5 units of 342 MW each and one 40 MW. Design Energy is 6322 MU in 90% dependable year. |
Demwe Upper HEP
|
|
|
DEMWE UPPER HYDROELECTRIC PROJECT |
| CLIENT:
Lohit Urja Power Pvt. Ltd. |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Detailed Project Report (DPR), Tender Design and assistance in award of EPC Contract of 1080 MW Demwe Upper HE Project, Arunachal Pradesh. |
| PROJECT DESCRIPTION:
Demwe Upper HE Project is located in Anjaw District of Arunachal Pradesh on Lohit river. The proposed project site is 80 km away from Tezu which is District HQ of Lohit. The Dam site is located about 12.8 km downstream of confluence of Dalai River and underground Powerhouse is located on right bank of Lohit River at 150 m downstream of the dam axis. The average river bed level at the dam site is about EL 440.00 m and FRL at the dam has been proposed at EL 525.00 m. The project consist of 131.0 m high composite dam, 5 nos. of 10.0 m dia. pressure shaft length varies from 150.0 m to 285.0 m, an underground powerhouse having 5 units of 206 MW and 1 unit of 50 MW. The project would generate 3991 MU in 90% dependable year. |
Simang – I HEP
|
|
|
SIMANG – I HYDROELECTRIC PROJECT |
| CLIENT:
Yedla Infra Pvt. Ltd. |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR) and assistance in obtaining clearance from Statutory Authorities for 67 MW Simang – I HE Project, Arunachal Pradesh. |
| PROJECT DESCRIPTION:
The studies carried out by AEMPL includes:
|
Simang – II HEP
![]() |
|
SIMANG – II HYDROELECTRIC PROJECT |
| CLIENT:
Yedla Infra Pvt. Ltd. |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for Preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR) and assistance in obtaining clearance from Statutory Authorities for 66 MW Simang – II HE Project, Arunachal Pradesh. |
| PROJECT DESCRIPTION:
The studies carried out by AEMPL includes:
|
Tsibjalumchhu Diversion Scheme
![]() |
|
TSIBJALAMCHU DIVERSION SCHEME OF TALA HEP |
| CLIENT:
Abir Infrastructure Private Limited |
| LOCATION:
Bhutan |
| SCOPE OF SERVICES:
Engineering consultancy for preparation of detailed design and drawings for the construction of river diversion arrangement, Trench weir, intake, HRT and Hydro mechanical equipment. |
| PROJECT DESCRIPTION:
Tsibjalumchhu is a left bank tributary of River Wangchhu joining just downstream of Tala Dam. Tsibjalumchhu Diversion Scheme is the diversion of Tsibjalumchhu Nala to the existing Tala reservoir to augment generation from 1020 MW during lean flow season. The major component of the project consists of the following:
|
Yamne – II HEP
|
|
|
YAMNE – II HYDROELECTRIC PROJECT |
| CLIENT:
S S Yamne Power Pvt. Ltd. |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Concept to Commissioning Consulting Services of 90MW Yamne – II HE Project, Arunachal Pradesh. |
| PROJECT DESCRIPTION:
Yamne Stage – II H.E. Project is located in the Upper Siang District of Arunachal Pradesh on Yamne river. The average river bed level at the barrage site is about EL. 517 m and FRL at the barrage has been proposed at EL. 536.0 m. The Project will utilize a gross head of 96.0 m and design discharge of 117.32 Cumecs for generation of 90 MW. Yamne – II H.E Project envisages of 22 m high Barrage with diversion tunnel & channel as diversion structure, 20m wide approach channel, 2Nos of De-silting Basin, 1No.of Power Intake with trash rack arrangement, 1No. of 6.5 m diameter head race tunnel&6.34 km long, 1No.of 19.0 m diameter surge shaft&93.80 m high, 1No.of 5.5 m diameter pressure tunnels & 187.21 m long . A Surface power station housing 3 units of 30 MW each. Design Energy is 367.43 MU in 90% dependable year. |
Yamne – I HEP
|
|
|
YAMNE – I HYDROELECTRIC PROJECT |
| CLIENT:
S S Yamne Power Pvt. Ltd. |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for preparation of Pre-feasibility Report (PFR), Detailed Project Report (DPR), Concept to Commissioning Consulting Services of 135 MW Yamne – I HE Project, Arunachal Pradesh |
| PROJECT DESCRIPTION:
Yamne Stage – I H.E. Project is located in the Upper Siang District of Arunachal Pradesh on Yamne river. The average river bed level at the dam site is about El. 690 m and FRL at the dam has been proposed at El. 735.0 m. The Project will utilize a gross head of 170.0m and design discharge of 96.97 cumecs for generation of 135 MW. A Concrete Gravity Dam of 47.0m height and 221.15m length at top has been proposed as diversion structure, 11.20 km long 6.5m diameter HRT, 91.0 m high 15.0 m diameter surge shaft, 709 m long & 5.0 m diameter pressure tunnels including penstock & vertical shaft. A Surface power house housing 3 units of 45 MW each. Design Energy is 602 MU in 90% dependable year. |
Khuitam HEP
![]() |
|
KHUITAM HYDROELECTRIC PROJECT |
| CLIENT:
Adhishankar Power Private Limited |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL engaged to provide engineering consultancy services for preparation of Detailed Project Report and Tender Design for Khuitam HE Project |
| PROJECT DESCRIPTION:
Khuitam Project is located across Gang River, a tributary of Bichom River in West Kameng District of Arunachal Pradesh. The project consists of a 19 m high diversion structure (barrage) about 12.26 km downstream of Rahung village and a Surface Power House site is located upstream of Selari Village with an installed capacity of 3 x 22 MW. |
Emra HEP
|
|
|
EMRA – II HYDROELECTRIC PROJECT |
| CLIENT:
Athena Emra Power Private Limited |
| LOCATION:
Arunachal Pradesh, India |
| SCOPE OF SERVICES:
AEMPL provided engineering consultancy services for optimum utilization of Emra River and preparation of pre-feasibility report for Emra – II (315MW) HE Project and obtaining approval from statuary authorities. |
| PROJECT DESCRIPTION:
The Project is a run of river/storage type Hydroelectric Project on confluence of Emra & Tangon river in Dibang River, Arunachal Pradesh. AEMPL was involved in preparation of various alternatives at Pre-feasibility stage and from which one alternative is considered which is cost-effective and techno-economically layout. The project consists of gravity dam of height 113 m and of length 256 m across River Subansiri where the river bed elevation is EL. 594 m. The water for power generation is conveyed through a steel pressure shaft of 7 m diameter which further bifurcates to feed the units in the underground power house. The underground power house is situated in the left bank of River Emra and measures79 m (l) x 14 m (w) x 15.5 m (h). The underground power houses 3 vertical axis Francis turbines to generate 315 MW. The design energy in the calculated to be 1491.59 MU. |
Ministry of Enviroment and Forest
“Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quia consequuntur magni dolores eos qui ratione voluptatem sequi nesciunt. Neque porro quisquam est, qui dolorem ipsum quia dolor sit amet, consectetur, adipisci velit, sed quia non numquam eius modi tempora incidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quis nostrum exercitationem ullam corporis suscipit laboriosam, nisi ut aliquid ex ea commodi consequatur? Quis autem vel eum iure reprehenderit qui in ea voluptate velit esse quam nihil molestiae consequatur, vel illum qui dolorem eum fugiat quo voluptas nulla pariatur?”
Geological Survey of India
“Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quia consequuntur magni dolores eos qui ratione voluptatem sequi nesciunt. Neque porro quisquam est, qui dolorem ipsum quia dolor sit amet, consectetur, adipisci velit, sed quia non numquam eius modi tempora incidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quis nostrum exercitationem ullam corporis suscipit laboriosam, nisi ut aliquid ex ea commodi consequatur? Quis autem vel eum iure reprehenderit qui in ea voluptate velit esse quam nihil molestiae consequatur, vel illum qui dolorem eum fugiat quo voluptas nulla pariatur?”
Central Electricity Regulatory Commission
“Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quia consequuntur magni dolores eos qui ratione voluptatem sequi nesciunt. Neque porro quisquam est, qui dolorem ipsum quia dolor sit amet, consectetur, adipisci velit, sed quia non numquam eius modi tempora incidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quis nostrum exercitationem ullam corporis suscipit laboriosam, nisi ut aliquid ex ea commodi consequatur? Quis autem vel eum iure reprehenderit qui in ea voluptate velit esse quam nihil molestiae consequatur, vel illum qui dolorem eum fugiat quo voluptas nulla pariatur?”
Central Electricity Authority
“Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium, totam rem aperiam, eaque ipsa quae ab illo inventore veritatis et quasi architecto beatae vitae dicta sunt explicabo. Nemo enim ipsam voluptatem quia voluptas sit aspernatur aut odit aut fugit, sed quia consequuntur magni dolores eos qui ratione voluptatem sequi nesciunt. Neque porro quisquam est, qui dolorem ipsum quia dolor sit amet, consectetur, adipisci velit, sed quia non numquam eius modi tempora incidunt ut labore et dolore magnam aliquam quaerat voluptatem. Ut enim ad minima veniam, quis nostrum exercitationem ullam corporis suscipit laboriosam, nisi ut aliquid ex ea commodi consequatur? Quis autem vel eum iure reprehenderit qui in ea voluptate velit esse quam nihil molestiae consequatur, vel illum qui dolorem eum fugiat quo voluptas nulla pariatur?”
ABOUT AEMPL
AEMPL, established in 2008, is an ISO 9001, 14001 and 45001 accredited company, having extensive experience in providing Engineering Consultancy Services under Renewable Energy (Hydro Electric Power, Pumped Storage and Solar) Projects and Transmission, Distribution line, Substation projects along with other infrastructure projects comprising Urban Infrastructure; Roads and Highways; Tunnel Projects; Buildings, Railway Infrastructure; Irrigation; and Oil & Gas Projects.
Our area of expertise lies from concept stage to commissioning stage including “Identification of Green Field Projects”, “Concept planning”, “Preparation and Review of Pre-Feasibility Report, Feasibility Report, Detailed Project Report”, “Assistance in obtaining Statutory Approvals and Clearances”, “Tender Engineering and Procurement Assistance”, “Detailed Design and Engineering”, “Design Review Engineering”, “Project Management”, “Contract Management”, “Commissioning and Post Commissioning Service”, “Due Diligence”, “Cost Vetting”, “Geological and Geotechnical Investigations”, “renovation and modernization”, with other services as per the requirements.
The company has been empanelled in some of the esteemed design organizations in the country. The company has been involved in projects in India, Oman, Bhutan, Uganda & Rwanda with offices in Delhi, Gurugram and Bengaluru, and site offices in Jammu, Srinagar, Sikkim, Chennai and Belagavi.
AEMPL’s core business is in the field of Energy Generation and has been involved in several projects at all stages of Hydro Electric Power / Pumped Storage Hydro plants set up, right from identification to commissioning along with O&M services.
We are also engaged in identifying the Pumped Storage Sites for the Clients and hand hold them for site visits and preparation of Pre-Feasibility Report in getting the MoU signed from the respective States.
Till date, we have been involved in identifying more than 80 PSH Projects across India and Oman for renowned Clients, prepared more than 40 Pre-Feasibility Reports and involved in more than 15 nos. of Detailed Project Reports for PSH Projects.
MISSION & VISION
Our Mission
Providing complete Engineering & Management Consultancy in Infrastructure and Energy Sector by adopting the Best Engineering Practices for achieving Customer satisfaction.
Our Vision
To be a leading Global Engineering and Project Management Consultant for achieving excellence in Infrastructure and Energy Sector Projects
KEY PROFESSIONALS
KEY RESOURCES – CIVIL

- Mr. Naresh Kumar, Hydropower/PSP/Geotechnical/Tunnels/Underground Structures Expert
Retired Chief Engineering from Central Water Commission and served in the Commission for nearly 35 years from 1976 to 2011.
He has more than 49 years of experience in management of various activities related to Planning, Preparation and Review of Feasibility study Report, Detailed Project Report, EPC Documents & Construction supervision as Owner’s Engineer including cost vetting and checking of tariff policies for both conventional and pumped storage hydro-electric projects. He has handled more than 40 no. of power projects during his working tenure.
He has published more than 20 numbers of technical papers in different national and international Journals / seminars, and having in his credit more than 100 nos. of technical reports/documents.
He has received a number of Merit Certificates and awards for his contribution for the development of Hydropower projects in India & Bhutan.
He is an active member of Indian Geo-technical Society (IGS) and Indian society of Rock Mechanics & Tunnelling Technology (ISRMTT).

- Mr. C.S. Mathur, Dam Design Expert
Retired Chief Engineering from Central Water Commission and served in the Commission for nearly 35 years from 1975 to 1996 and 1998 to 2011. He has more than 50 years of experience in Planning & Design of Concrete/Masonry Dams, Spillways, Energy Dissipaters and other appurtenant structures. Other areas of expertise include Hydrological Studies for projects; Designs of Earth and Rock fill dams, Barrages, Water Conductor Systems, Tunnels etc.; Investigations and Preparation of DPR for projects; Dam Safety Issues.

- Mr. Rajeev Sachdeva, Hydropower/PSP/Hydraulics/Tunnels/Underground Structures Design Expert
Retired as General Manager from NHPC Limited, he has more than 39 years of experience in planning, detailed engineering designs, Review of Designs and construction drawings and construction supervision of various hydro-electric projects/Pumped Storage Plants involving dams (small, medium and high), spillways, Head race tunnels, Surge shafts, Pressure shafts and power houses (both underground and surface) etc. Hydraulic and structural designs (including review) for surface/ underground works comprising Barrage, Dam, Desander Basin, HRT, Surge shaft, pressure shaft/penstock and powerhouse (Both Surface and Underground) conforming to various international standards.

- Mr. S.K. Sibal, Dam Design/Hydraulics/Structural Expert
Retired Member (D&R) from Central Water Commission and served in the Commission from 1988 to 2024.He has more than 36 years of experience with a demonstrated history of working in the Central Water Commission. He is skilled in planning and designing Water Resources Projects, especially concrete and embankment dams, Spillways, Energy Dissipation Arrangements.

- Mr. Syed Javed Mohsin,Hydropower / PSP Expert
Served in North Eastern Electric Power Corporation Limited (NEEPCo) for nearly 15 years from 1991 to 2006.
He has more than 34 years of experience having technical, commercial and financial responsibilities under power projects comprising overall Project Management; Manpower management and HR/IR matters; Operation and Maintenance of power projects and associated transmission lines; Fixation of Tariff and approval of the Central / State Electricity Regulatory Commission; Planning for New Projects; Financial Closure for new projects; Contract Management and arbitration along with claim management, risk assessment and management, litigation management, resolving disputes in reduced time and saving money, quantification and apportionment of cost, etc.; He has also has problem solving skill developed over his tenure which he easily communicates over to the team that he works with his excellent communication techniques. He is part of the various expert committees that deliberate on critical aspects of power including costs optimization, arbitration in power sector, etc. He presents his studies and finding on various forums to bring to notice of the fraternity at large about the same.

- Mr. Parveen Kumar, Hydropower/PSP Expert
He has more than 34 years of experience in project identification, planning, analysis, geo-technical investigations, DPR and construction stage design of hydropower, irrigation and water supply projects covering embankment and gravity dams, barrages, diversion & outlet structures. power Intake, surface and underground desilting chambers, cut and cover conduits, tunnels, surge shaft, penstocks, cross drainage works like aqua-duct, bridges etc. During his tenure, he is involved as Team Leader under various projects with leadership skills and clients’ handling skills.

- Mr. Mohammad Jamal Ahmad Urfi,Construction Management Expert
He has more than 34 years of experience in Review and monitoring of site activities of various civil works of the hydro project. Interfacing field / site activities between project team and Head Office, including involvement in planning and scheduling of project activities. Coordinating with Client and EPC Contractor Review of contractor’s progressive bill and issue payment certificate. Complete inspection of works carried out at site and approval of check measurements.

- Mr. Bikas C. Singh,Powerhouse/Structures Expert
He has more than 30 years of experience in Structural Design/ Detailing of Building, Hydroelectric power, Railway, Underground & Elevated Metro projects.

- Mr. Rajeev Baboota,Hydrology Expert
He has more than 39 years of experience in HEPs and PSPs, with extensive expertise in hydrological and hydro-meteorological studies for detailed design, including river discharge analysis, sediment and silt studies, design flood estimation, flood forecasting, dam break analysis, hydraulic and mathematical modelling, and meteorological assessments. He is experienced in hydro-meteorological data collection, real-time hourly data recording, reservoir and dam operation monitoring, and integration of Automatic Weather Station data, and is proficient in implementing ISO 9001–compliant hydrology data management systems to ensure accurate, standardized, and reliable project data.

- Mr. Sarabjit Singh,Geotechnical Expert
He has over 40 years of extensive experience in the hydropower sector. He served with NHPC Ltd. from 1985 to 2021, retiring as General Manager (Civil Design), and has subsequently worked as a consultant with reputed organizations. His experience spans design, review, and execution of large-scale hydroelectric projects including Ratle, Parbati-II, Lower Subansiri, and Dhauliganga. He has undergone specialized training in machine foundation design, dynamic analysis of dams, tunnel analysis, and advanced structural analysis using international software. He has also gained international exposure through training programs in France and Switzerland and has consistently contributed to the successful delivery of complex hydropower projects.

- Mr. Dayalan Kadirvelu,Sr. Structural Engineer
He has more than 17 years of experience in civil and structural design, quality assurance and cost estimation. He has experience in concrete and steel structure designs, supports and foundations, and other heavy equipment support. Responsibilities include layout, analysis and design, review, coordination and field inspection of projects. Having good exposure to Indian codes of Practices and American codes. Computer modelling (2D/3D) of structure and analysis using STAAD-Pro. Performing seismic and wind analysis. Understanding and reviewing designs for tower foundations, control room building designs, switchyard structures, switchyard equipment, roads, rafts, DG foundations and steel building designs. Preparation of design sheets using excel and Math Cad sheets. He can work independently and as a part of a team with an ability to deliver within short deadlines. Performing Quantity Estimation, Cost Estimation & BOQ. Review of drawings for equipment regarding civil design and detailing implications submitted by vendor. Compiling of design calculations/reports, checking calculations of designers and other engineers within the team. Develop designs to satisfy technical specifications.

- Mr. Winfred George, Sr. Underground Structural/Hydropower/PSP Engineer
He has more than 17 years of experience in civil and structural design, quality assurance and cost estimation. He has experience in concrete and steel structure designs, supports and foundations, and other heavy equipment support. Responsibilities include layout, analysis and design, review, coordination, and field inspection of projects. Having good exposure to Indian codes of Practices and American codes. Computer modelling (2D/3D) for performing stability analysis comprising seismic consideration of slope and underground excavations and the design of support systems. Has been working independently in delivering projects on schedule with success. Review of drawings for equipment regarding civil design and detailing implications submitted by vendor. Compiling of design calculations/reports, checking calculations of designers and other engineers within the team. Develop designs to satisfy technical specifications.
KEY RESOURCES – GEOLOGY

- Mr. Imran Sayeed, Geology Expert
Retired Chief General Manager (Geotech) from National Hydroelectric Power Corporation Ltd (NHPC) and served the same organization for nearly 34 years from 1985 to 2019. Thereafter worked as Independent Consultant and worked for hydro projects in India and Nepal, infrastructure projects in H.P. between 2019 and 2022. Has been member of Sectional Committee WRD 5 and CED 48 for Bureau of Indian Standards. He has more than 40 years of experience in planning, execution and supervision of all surface and subsurface investigations, identification and delineation of critical geological features affecting projects, optimization of project layout based on geological findings, rock mass characterization and geotechnical inputs in detailed design of project components. He has worked on reserve estimation in quarries and burrow areas and quality evaluation for construction materials including concrete aggregates, rock fill and impervious soil. Lab and in-situ soil and rock mechanic tests, interactions and obtaining TEC form regulatory bodies, geological inputs and coordination for studies for seismic design parameters and obtained clearances from NCSDP. He has construction supervision and geological/geotechnical monitoring experience in large hydropower projects.

- Mr. S.K. Tripathi, Geology Expert
Retired Additional Director General (ADG) & HoD from Geological Survey of India (GSI) and served in the department for nearly 34 years from 1985 to 2019. He has more than 39 years of experience in planning, execution and supervision of all surface & subsurface investigations; identification and delineation of wide shear zones along the right bank/abutment, optimization of project layout; geological & geotechnical inputs for optimizing design; identification, reserve estimation of quarry & borrow areas for wearing & non wearing surface aggregates; Lab & in situ rock mechanics tests; Geological inputs for ascertaining Seismic Design Parameters and obtained clearance from National Committee on Seismic Design Parameters

- Mr. Yogendra Singh Yadav,Sr. Geologist
He has more than 20 years of experience in detailed Geological and Geotechnical studies of projects. Preparation of detailed geological maps on different scales for the techno-economical optimization of the proposed project layout at PFR, DPR, Pre-constructions stages of investigations, planning and execution of surface and sub-surface investigations (exploratory boreholes, drifts, in situ rock mechanics tests etc.), Site selection. During his tenure, he is involved as a Senior Geologist under various projects

- Mr. Ajay Ekka, Geologist
He has more than 14 years of experience in detailed Geological and Geotechnical studies of project. Preparation of detailed geological maps on different scales for the techno-economical optimization of the proposed project layout at PFR, DPR, Pre-constructions and Construction stages of investigations, planning and execution of surface and sub-surface investigations (exploratory boreholes, drifts, in situ rock mechanics tests etc. During his tenure, he is being involved as a Senior Geology Engineer under various projects.
RESOURCES – ELECTRO-MECHANICAL

- Mr. Rajeev Thakur, E-BOP Expert
Served as an Assistant Manager in National Hydro Electric Power Corporation Private Limited, Government of India Hydropower Board and served for nearly 7 years from 2001 to 2007. He has more than 24 years of experience in planning & design engineering, contract management, client interaction and coordination with the design team for execution of electro-mechanical works of hydro power projects. He has experience in preparation of pre-feasibility/feasibility study reports, detail project reports, technical specification, tendering and bid evaluation, financial analysis, inspection & quality assurance, scrutiny of drawings and documents at detailed engineering stage, SWOT analysis, preparation of skill-matrix and financial proposal

- Mr. Shashank Hariharan, E-BOP/Control & Protection Expert
He has more than 20 years of experience in Planning, Designing, scheduling, preparation of detailed project report along with cost estimation, vendor management, preparation of construction / erection / commissioning schedule for electro-mechanical components under Hydro Electric Projects, responsible to carry out designs, estimation and scheduling of SCADA and automation related works, review of electro-mechanical and electrical components under the assignment along with checking and revision of BoQ, vendor management, cost evaluation, rate analysis and cost estimation. He is also responsible for delivering the project and analysis of tariff policy to be adopted.

- Mr. Akib Alam,E-BoP, Control & Protection Engineer
He has more than 11 years of comprehensive experience in electrical design engineering, erection, and commissioning of hydro power plants and control systems. Proven expertise in preparation of Single Line Diagrams (SLD), powerhouse and switchyard layouts for hydro power plants. Responsibilities covered equipment and component sizing, cable scheduling, load estimation, I/O list preparation, and development of technical specifications. Involved in engineering and review of Electrical Balance of Plant (EBOP) items, along with design drawings and schematic controls in accordance with project requirements. Experience also includes conducting Factory Acceptance Tests (FAT) for generators, power and auxiliary transformers, DC systems, MV/HV/LV panels, control and protection panels, CWS and D&D systems, and NGT panels. Proven ability to resolve site-related issues during erection and commissioning phases of hydroelectric projects. Familiar with DEIF controllers, SCADA integration, and preparation of as-built documentation. Demonstrated capability in coordinating with clients, consultants, and vendors for successful execution of EPC and design-built projects.

- Mr. J.K. Khatri,Turbine Layout and MBoP Expert
Retired as Chief Engineer from Hydro Engineering & Technology Development Division in the Central Electricity Authority, Ministry of Power, Government of India and served for nearly 33 years from 1978 to 2011.
He had worked in between as Deputy Director in Hydro Construction Monitoring Division for 2 years; in Eastern Regional Power Committee, Kolkata as Superintending Engineer (Commercial) for 1 year and at Tala Hydro Electric Project, Bhutan as Superintending Engineer (O&M) for 2 years.
Since last 49 years, he has been associated with design & engineering assignments of all kinds of hydro power projects – be it surface or underground project or a pumped storage scheme involving variety of hydro turbines such as Francis, Kaplan, Pelton, Bulb, Tubular and Reversible Pump-Turbines in various sizes ranging from small hydro to large hydro projects in India, Bhutan, Afghanistan and Nepal.

- Mr. Shiban Krishan Kaul, Generator, Layouts & E-BOP Expert
Retired Chief Engineer from Central Electricity Authority, Ministry of Power, Government of India and served for nearly 33 years from 1979 to 2012.
He has more than 46 years of experience in the electro-mechanical design and engineering of hydroelectric projects, covering all types of switchgears, switchyards, electrical protections, and plant control. His responsibilities include the preparation of specifications, drawings, bid evaluations, and the vetting of manufacturer’s drawings and methodologies. He conducts site visits, provides on-the-spot technical advice, and manages contracts. He coordinates with ministry officers and other stakeholders, participating in meetings to identify and resolve issues hindering project implementation. He has also been involved in initiatives to fast-track hydro project implementation, addressing stalled or stressed projects, developing pumped storage, and integrating renewable power with the grid. Additionally, he has suggested modifications in bid stipulations to increase vendor participation and addressed issues related to milestone-based payments.

- Mr. Suresh Nair ,Turbine & M-BOP Expert
Retired Additional General Manager from BHEL, and served for nearly 29 years from 1978 to 2007, He has more than 47 years of experience in looking after basic and detail design of Turbines, Valves, mechanical balance of plant and Renovation, Modernization and Uprating of Hydro-Electric and Pumped Storage Hydro projects. Also worked for developing standard designs for mini hydro and Irrigation pumps. Led design of more than 100 static & rotary parts of turbines and auxiliary systems across 100 Hydro Power Stations

- Mr. Sriram R.,Control & Protection System Expert
Retired General Manager & Unit Head from BHEL and served for nearly 38 years from 1979 to 2017. He has more than 47 years of experience in Design and Development of Distributed control systems/C&I for a wide range/ratings of Hydroelectric power plants, Digital governors, HMI systems. Responsible for project/product engineering more than 100 projects in India and abroad. He has served as a Top-Level Expert at WAPCOS for Punatsangchu-1 and 2 in Bhutan, and as a Consultant at QUEST Limited, conducting third-party inspections for defense projects. His tenure at Bharat Heavy Electricals Limited spanned over three decades, where he held various leadership roles and managed over 100 hydro control engineering projects. He is a Senior Member of IEEE and holds several patents in hydro plant optimization and control systems

- Mr. S.K. Bhowmick, Transmission & Sub-Station Expert
He has more than 45 years of experience in Detail Design Engineering, Construction Supervision, Testing & Commissioning Power Line and substation, Preparation of Technical Specification, Layout, Structure Design, Earthing Design, Lightning Protection Design, Equipment Design, Design of illumination system, Frequency planning & design of Power Line Carrier Communication, Preparation of substation bill of quantity and cost estimate.
RESOURCES – HYDRO-MECHANICAL

- Mr. V.K. Maini, Hydro-Mechanical Expert
Retired Executive Director from National Hydroelectric Power Corporation Limited (NHPC) and served in the department for nearly 36 years from 1985 to 2021.
He has more than 40 years of experience in project identification, planning, analysis, geo-technical investigations, DPR and construction stage design of hydropower, irrigation and water supply projects covering embankment and gravity dams, barrages, diversion & outlet structures. power Intake, surface and underground desilting chambers, cut and cover conduits, tunnels, surge shaft, penstocks, cross drainage works like aqua-duct, bridges etc. During his tenure, he is involved as Team Leader under various projects with leadership skills and clients’ handling skills. He has been involved in more than 45 nos. of hydro power projects including Renovation, Modernization, Life extension and Uprating of hydro power projects

- Mr. Gagan Ratnakar, Sr. Hydro-Mechanical Engineer
He has more than 20 years of experience in carrying out Designs of Hydro-Mechanical components, Overview of complete Hydro Power Plant, Preparation of Technical Specifications of Hydro-Mechanical Systems, BOQ and Cost estimation of Hydro – Mechanical Systems, Design, Selection and Review of Design & Drawings of Gates, Hoists and EOT Cranes, Experience in Tender Preparation, Bid Evaluation, Technical Offer Evaluations, Coordination & Technical follow up on contracts, Inspection & Testing of Gates, Hoists and EOT Cranes, Control Systems, Automation & SCADA regarding HM Works
ACHEIVEMENTS
PUMPED STORAGE HYDRO PROJECTS
- Aquagreen Engineering Management is engaged in identifying the Pumped Storage Hydro Sites for the renowned Developers / IPPs (Clients) and hand hold them for site visits and preparation of Pre-Feasibility Report in getting the MoU signed from the respective States along with DPR preparation.
- So far, we have identified more than 80 nos. PSHP locations collectively across India and Oman with capacities ranging from 100 MW to 10,000 MW.
- Aquagreen has completed more than 40 nos. of PFRs of identified Greenfield PSHP sites and engaged in preparation of 15 nos. of DPRs for Pumped Storage Hydro Projects. .
- Till date, we have completed the Detailed Project Reports of:
- Bilaspur (1000 MW) PSHP in Chhattisgarh for Jindal Renewable Power Private Limited
- Kamalapadu (950 MW) PSHP in Andhra Pradesh for APGENCO – NREDCAP
- 130 MW Vijayanagar PSHP, Karnataka for JSW Energy Limited
- Currently, we have been involved in Design review Engineering of:
- Gandikota Pumped Storage Hydro Project (1800 MW), Andhra Pradesh for Adani Group
- Shahpur Pumped Storage Hydro Project (1800 MW), Rajasthan for Greenko Group
- We are also lender’s engineer for REC Limited and acting as Project Management Agency for Saundatti Pumped Storage Project (1600 MW), Karnataka
HYDRO ELECTRIC PROJECTS
- Aquagreen Engineering Management is involved in design and engineering work of more than 50 hydroelectric Power projects totaling about 60,000 MW.
- Having good experience in hydro-electric projects since its inception, Aquagreen Engineering Management is empanelled with the following reputed organizations of Government of India:
- Central Electricity Regulatory Commission (CERC)
- North Eastern Electric Power Corporation Limited (NEEPCO)
- Indian Renewable Energy Development Agency (IREDA)
- Power Finance Corporation Consulting Limited (PFCCL)
- Export Import Bank of India (EXIM)
- Maharashtra Electricity Regulatory Commission
- In March 2020, we have completed our Designing and Project Management consultancy service along with O&M services to Teesta III Hydro Electric Project (1200 MW) in Sikkim which is India’s second largest hydro power project and has declared CoD in February 2017. We are currently lender’s engineer to REC Limited and acting as Project Management Agency for Restoration of Teesta III HEP.
- Till Date, we have completed DPRs of the following HEPs:
- 270 MW Anjaw Hydro Electric Project in Arunachal Pradesh for Lohit Urja Pvt. Ltd. (CEA Concurred)
- 8 HEPs of cumulative capacity of 156.06 MW for Manipur State Power Corporation Limited, Manipur (CEA Concurred)
- Kynshi – I HEP (270 MW) in Meghalaya (CEA Concurred)
- Simang I & II HEPs, Himachal Pradesh (CEA Concurred)
- Khuitam HEP in Arunachal Pradesh (CEA Concurred)
- Pemashelpu HEP (81 MW), Arunachal Pradesh
- 18.5 MW Sankoo HEP, 19 MW Durbuk Shyok HEP, 19 MW Mangdum Sangra HEP and 24 MW Nimu Chilling HEP) of Jammu & Kashmir Power Development Corporation Limited (JKPDCL) located in the mountainous regions of Leh and Kargil in Jammu & Kashmir
- We have provided detailed design engineering services under the following projects:
- Construction of Tailing Pond on Turnkey Basis for COB Plant at South Kaliapani in the district of Jajpur, Odisha
- Malana II Hydro Electric Project (100 MW), Himachal Pradesh (Additional Spillway)
- Tsibjalamchu Diversion Scheme under Tala Hydro Electric Project (1020 MW), Bhutan. AEMPL professionals supervised the Construction activities at Project Site and the Diversion Scheme was successfully completed within a record time period of 8 months.
- Civil Works of 7.5 MW Mini Hydroelectric Power Plant, Djenne in Republic of Mali for Owner ‘Energie Du Mali (EDM-SA)’, Africa
- Aquagreen Engineering Management have expertise in providing solutions for renovation and rectification of hydroelectric power plants, we have engaged and completed the services under:
- Malana II Hydro Electric Project (100 MW) in Himachal Pradesh, India wherein the HRT and 600 m height steel pressure shaft was rectified, and the plant was successfully commissioned.
- Sorang Hydro Electric Project (100 MW) in Himachal Pradesh, India whose surface penstock is currently under rectification based on the revised design provided by Aquagreen Engineering Management
- Kameng Hydro Electric Project (600 MW) in Arunachal Pradesh, India wherein the both the penstocks of the project were rectified based on our rectification methodology recommended after leakages were reported during initial filling
- HPPCL’s of Integrated Kashang HEP in Himachal Pradesh wherein we provided the design solutions for rectification of steel lined pressure shaft
- AEMPL has successfully reviewed the feasibility study report of Ayago Hydro Power Project (680 MW) as part of the scope of services of Owner’s Engineer of the project. The review resulted in revision of installed capacity of the project from 680 MW to 840 MW. MEMO owner of project has approved the revised capacity.
OTHER INFRASTRUCTURE PROJECTS
- We have successfully provided our services in other infrastructure projects. Major projects are listed below:
- Solor
- Development of 1000 MW Ground Mounted Solar Power Project near Puligundlapalle, Talapula Mandal in Sri Satya Sai District of Andhra Pradesh (Ongoing)
- Off-grid Solar Power Project for Irrigation schemes in Kirehe District, Rwanda (Completed)
- 50 MWp Solar Power Project, Three Springs, Western Australia (Completed)
- 1 MW Solar Photo Voltaic Plant at Namchi District, Sikkim, India
- IRRIGATION
- Mahama & Mpanga Irrigation Scheme, Rwanda (Scope includes Preparation of Detailed Project Report (DPR), Tender Design, Technical Specifications and assistance to WAPCOS for the Intake System Works) – Completed
- North Koel Irrigation Project, Jharkhand and Bihar, India (Carried out works for WAPCOS Ltd. Scope includes Preparation of Design and drawings for remodelling of structures along Right Main Canal of the Project) – Completed
- WATER RESOURCE / TOURISM
- PMC of Tawi River Front Development Project for Jammu Smart City Limited (97% completed)
- DPR for Kondhane Dam Project (74 m high CFRD) for CIDCO, Maharashtra (DPR submitted)
- PMC for completion of Ulwe Recourse Channel work for Navi Mumbai International Airport, Maharashtra (Completed)
- RAILWAYS
- Designing a Natural Ventilation Shaft for 2.2 km Long Tunnel under the Dausa-Gangapur City New BG Line Project (Completed)
- Sub-Consultant to AECOM for Bengaluru Suburban Railway Project (BSRP), Karnataka (Services Rendered)
- Sub-Consultant to AECOM for Chennai Metro Rail Limited Project (CMRL), Karnataka (Ongoing)
- BUILDINGS
- Detailed Design and PMC of Baypark Wellness Resort at Vishakhapatnam (Completed)
- Detailed Design and PMC of Mihir CGS Society Limited, Gurugram, Haryana (Completed)
AREAS OF SPECIALISATION
- Identification of Greenfield Projects.
- Concept to Commissioning Engineering Services.
- Pre-feasibility Reports and Due diligence etc.
- Site selection, Planning and supervision of field investigation, Geological and Geo-technical investigations, construction material survey and reserve estimation
- Detailed Project Reports and obtaining Techno Economic Clearance (TEC).
- Tender Stage designs and Tender documents of Civil, HM and E & M Packages.
- Preparation of Bid Documents
- Detailed designs and construction drawings
- Supervision of Hydraulic model studies
- Construction supervision, construction management and Quality Assurance & Quality Control.
- Review of Detailed Project Report/Feasibility Studies Report, Tender Documents and Detailed Design
- Erection, Pre commissioning, commissioning and Post commissioning services
- Engineering services for operation and maintenance
- Restoration & rehabilitation services
- Contract Management Services
- Technical Audit
- Vetting of Capital Cost and Financial Analysis
- Vetting of Project Completion Cost, Time and Cost Over-run
- Vetting of Contractor’s Claims
- Technical Support for forensic investigations