AYAGO HYDROELECTRIC PROJECT |
CLIENT:
Ministry of Energy & Mineral Development (MEMD), The Republic of Uganda |
LOCATION:
Murchison Falls National Park District, Uganda |
SCOPE OF SERVICES:
AEMPL engaged to provide Engineering Consultancy Services for the Review of the Detailed Feasibility Study and Supervision of the Construction of Ayago Hydro Power Project and its associated Transmission Interconnection. |
PROJECT DESCRIPTION:
Ayago Hydro Electric Project has been contemplated as a run of the river scheme situated in the Murchison Falls National Park District of Uganda. The Diversion Dam is located across Nile River. The Project would utilize a head of 80 m and design discharge of 938 Cumecs for generation of 840 MW. The Project comprises of 24 m high Concrete Gravity dam, 6 Nos. of intake on left bank of Nile River feeding 6 Nos. of 6.6 m circular shaped pressure shaft, underground power house housing 6 units of 113.33 MW and 3 Nos. of 13 (W) x 15 (H) m D-shaped, 7.2 km long Tail Race Tunnel. |
- Malana – II HEP
- Rural Electrification Project (Uganda)