Shendra Delhi Mumbai Industrial Corridor Corporation Limited |
|||||||||||||||||||||||||||||||||||||||
CLIENT:
CH2M Hill International Private Limited (India) |
|||||||||||||||||||||||||||||||||||||||
ULTIMATE CLIENT:
Delhi Mumbai Industrial Corridor Development Corporation Limited |
|||||||||||||||||||||||||||||||||||||||
LOCATION:
Maharashtra, India |
|||||||||||||||||||||||||||||||||||||||
SCOPE OF SERVICES:
Construction Supervision of civil and electrical works; Contract Management including all aspects related to techical and commercial aspects. Project Planning, Monitoring, Control and Scheduling. |
|||||||||||||||||||||||||||||||||||||||
PROJECT DESCRIPTION:
Shendra Bidkin Industrial Area (SBIA) is located at a distance of approximately 15 km from downtown Aurangabad and is 8 km east of the Aurangabad Airport. It is planned as a new industrial corridor extending from the existing Maharashtra Industrial Development Corporation’s (MIDC) Shendra Industrial Park to the town of Bidkin. The total area of SBIA admeasuring 84.17 sq. km has been divided into two parts viz. Part-I and Part-II. The Part-I consisting of area of 41.42 sq. km, which is further divided into two parts, viz. Phase-I and Phase-II. The Phase-I covers an area of 8.39 sq. km located north of Jalna Road adjoining existing MIDC Shendra Industrial Park. Phase-II includes the remaining area of 32.03 sq. km located near Bidkin. The development of the Part-II of SBIA consisting of total area of 42.75 sq. km will be taken up at the later stage. PROJECT CHARACTERISTICS:
|