Sukhpura PSP

Preparation of Detailed Project Reports of Sukhpura Standalone Pumped Storage Project (2560 MW), Chittorgarh, Rajasthan

CLIENT:
Greenko Group
Year:
2022 – Ongoing (Draft DPR under preparation)
Scope:  

    • Preparation, Submission, Processing and Approval of Detailed Project Report (DPR) as per CEA/CWC/GSI/CSMRS guidelines till obtaining final Techno – Economic Clearance including stage wise preparation/ Submission of reports as per procedures laid down by CEA for grant of TEC.
    • Scope of work includes assessment of Site Geology, physical geological mapping, preparation of geological maps and other details required for the completion of Geological Chapter.
    • Surface & Sub surface exploration, monitoring of exploration, interpretation of data, incorporation of data for studies of optimization of layout and preparation of complete Geological Chapter including drawings/studies etc. is in the scope of consultant.
    • Attending and amending of the reports based on statutory authority’s observations including presentations / following up with all statutory associates with grant of TEC, till grant of TEC.
    • Support for Presentations to all statutory authorities, board management, bankers or any authority where client is required to present the DPR during preparation or post preparation stage.
    • Surface and Subsurface exploration / investigation plan. Review / Monitoring of site investigation /exploration works, and other essential/ associated studies required for the completion of DPR.
    • Study of all possible Alternative layout options with preliminary designs, drawings and their costs/Technical comparisons.
    • For all alternative layouts, Choice of Alternative Civil Structures, H&M options and E&M possibilities with their Cost/ Technical comparisons.
    • Elaboration of Construction Program and plant planning including Construction Methodology for all critical and main components.
    • Review of all documents supplied by the client and incorporation of the same in the DPR.
    • Support for selection of suitable construction material sites and Review of Test reports for suitability thereof.